My WebLink
|
Help
|
About
|
Sign Out
Home
2020.10.05 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2020 CC Packets
>
2020.10.05 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2020 9:27:47 AM
Creation date
10/21/2020 9:26:25 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
10/5/2019
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />Lions Park DD Consultants <br />October 5, 2020 <br />relocation, community sports pad. It also includes an asbestos and regulated material assessment <br />for a total cost of $83,300. <br /> <br />Pavilion Architecture: <br /> <br />At the City Council meeting of Sept ember 8, 2020, a request for proposals was approved for <br />architectural services for the pavilion in Lions Park. Proposals were received from Oertel <br />Architects; Hans, Christensen $ McIlwain (HCM) Architects; and Alliiance. The three <br />Architects were interviewed on Sept ember 25 ,2020. The interview panel is recommending <br />HCM Architects. Their proposal included collabor ation with WSB and leading the pavilion <br />stakeholder group to design the shelter at a cost of $20,900. They desing the shelter to 50% and <br />prepare layout plans, elevations, mechanical and electrical system narrative, material selection, <br />3-D models, project cost estimates, and more. <br /> <br />3. CONCLUSION: <br /> <br />Approval of the following consultant proposals is recommended to develop the design of Lions <br />Park: <br /> <br />• WSB for the Design Development of the Playground and Pavilion (contract): $57,000 <br />• WSB for the Design Development of the Park Site (contract): $83,300 <br />• HCM Architects for Architectural Planning & Design Services (proposal dated 9/1/20): <br />$20,900. <br /> <br /> <br /> <br />ATTACHMENTS <br />1) Lions Park Feasibility Study dated July 10, 2020 <br />2) WSB Contract (Pavilion and Playground) <br />3) WSB Contract (Park Site) <br />4) HCM Proposal dated September 21, 2020 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.