My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 08.13.20
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2020 PC Packets
>
PC Packet 08.13.20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 3:37:52 PM
Creation date
11/25/2020 3:34:38 PM
Metadata
Fields
Template:
Commissions
Meeting Date
8/13/2020
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roy Molitor 4th Addition — Pre Plat, CUP Amendment, Easement Vacation, and Site Plan <br />Page 6 <br />Building Architecture <br />In August 2011, the City Council adopted the Commercial and Industrial Design Guidelines. The <br />guidelines allow flexibility on four-sided architecture for industrial buildings. The design of the <br />building meets the intent of the guidelines. <br />The building material for the office/warehouse building consists of integrally colored precast tip - <br />up concrete panels, of two compliment colors and two patterning styles. The intent is to ensure <br />the building is constructed of quality materials that require minimum maintenance. The applicant <br />has provided elevations that show coloration and patterning in design of the concrete panels. The <br />concrete is proposed to be a light brown earth tone, with an accent dark brown tone. The front <br />has glass and there windows on all sides of the building. The applicant is proposing metal <br />awnings along the front of the building over the entrances. The applicant will be required to <br />submit the design to staff for review and approve the design of the awnings. The exterior doors <br />and overhead doors are proposed to be brown and compliment the exterior color (although they <br />are shown as white on the plans). Staff will work with the color and size of the overhead doors. <br />The applicant has provided material samples and staff will continue to work with the applicant <br />on the materials and color choices to ensure compatibility. <br />Staff recommends the main entrance of the site to be more clearly defined with architectural <br />elements and/or more glass/windows. <br />The applicant has not provided elevations for the proposed warehouse building or two office <br />buildings. As a campus development building architecture, materials, and colors for all buildings <br />should be compatible. This will be a condition of approval for the campus development CUP. <br />Signage <br />The applicant is not proposing any signage at this time but, it is allowed by ordinance. Prior to <br />the installation of any signs, the applicant shall obtain a sign permit. <br />Drainage/Grading <br />The applicant is proposing to utilize the existing ponds and infiltration basins and to meet the <br />stormwater management requirements. Treated stormwater is discharged into the wetland <br />complex to the west as well as the storm sewer system along the east side of Fenway Avenue. <br />The stromwater management is designed to accommodate all phase of the development. The plan <br />generally meets the stormwater requirements, however, staff will continue to work on the <br />technical details of the stormwater management design. A maintenance agreement between all <br />lots utilizing the stormwater management facilities shall be reviewed and approved by staff. The <br />document shall be recorded against the property. <br />At this time, the applicant is not proposing stormwater reuse. There is not enough green space on <br />the property to gain infiltration credits to meet the stormwater management requirements or <br />enough water within the pond to accommodate stormwater reuse. <br />
The URL can be used to link to this page
Your browser does not support the video tag.