Laserfiche WebLink
1 2 3 4 5 6 <br />1 / <br />\ / / <br />v / <br />\ <br />\\ n <br />I \ / <br />MN <br />IN, <br />II I I C601 <br />\ <br />935 <br />\ 1 g 934 \ _ <br />/ C601 933 <br />_ I <br />928.19 TC* C 928.61 TC 932 931 10 �c I <br />927.69 GL* I 8.11 GL C601 g <br />I 930.70 EOF 929 C601 OVER EXCAVATE APRROXIMATELY 1.5' <br />B a I 929.89 TC 928 WHERE REQUIRED TO REACH SP SOILS. <br />29.39 GL 31.00 TC BACKFILL WITH ENDED SOIL MEDIA. _ <br />/ GL 1 �.� <br />927.48 GIL I 930.50 C601 INFILTRATION BASIN #1 <br />• / / 8 930.30 CC ° °° BASIN BTM: 928.00 \ <br />/ 0 / C601 TLET: 929.60co o 0 (0 0 0 1 929 928 100-YEAR HWL: 930.66 \ <br />( w �,0-0 000 C601 \ <br />o 10 00 °00w ' 931 7 \ \ \ <br />_ <br />929.82 TC o 000 0 0° 1 932 C601 \ �s <br />• 929.32 GL ° ° c 931.34 TC 928.90 G <br />i 930.84 GL _v _ 933 1 \ <br />927.23 GL / / 931.34 TC ^,`"� \ 934 °°° C601 <br />I 930.84 GL wco 934.43 TC <br />928.36 TC 933.42 TC-� 933.51 TC \ I 933.93 GL - 933.16 CC <br />1927.86 GL / 932.92 RIM 933.01 GL ' 1 <br />l 93410 <br />T.01 TC <br />_>>_ j - J 934.43 TC ^ 933.71 GL C601 <br />q%% 927.52 C <br />927.02 GL* 933.93 GL <br />I / \ <br />' O 933.71 TC 6 934.50 TC 934.20 GL/TC / <br />(TYP.) 934.00 GL � �/ / / / / '- 'OVER EXCAVATE APR.5'ROXIMATELY 1 <br />933.21 GL (TYP.) C601 G)934 / / / / / / / ,/ / WHERE REQUIRED TO REACH SP SOILS. <br />I 9 934.41 TC 934.71 TC BACKFILL WITH AMENDED SOIL MEDIA. <br />/ C601 934.01 TC 933.91 GL 934.21 GL / 934.93 C 1 934.74 TC <br />934.71 C ; 1 934.34 GL <br />933.51 G <br />L 934.40 GL/TC / <br />934.88 G / I \ \� 10 <br />934.14 TC l I I �/� C601 <br />� 934.51 C _ 934.95 C - <br />933.64 GL o 934.73 C � � - - - \ C601 934.34 B -� I \ \ � <br />I/ / 933.96 GL ' 935.00 FFE C 935.50 TC ° 934.23 B I _�929 <br />Wg <br />934.52 _ <br />/ .934 L T .00 GL 931- <br />- - - - o <br />v , I 934.02 GL �NSpO 935935.C601 12 TC / - - - - - - ` <br />FFE' 935.00 (AR <br />N FACILITy 934.62 GL 933.00 933.00 TC/GL 2 933.42 BS _ - _ _ - - - - - �933` _ \ \ \ <br />934.51TS__- <br />934.60 TC 933.36 TL 933.99 BS / _ 60 Z- <br />935.00C 934.10GL-932.86G/_ _ -_ <br />__ _ _ <br />q, 934.51 B / / `�� ' 934.b7 BS / / / / / / / / _ _ _ _4i_ = = = <br />I \ 934.90 C 1 / <br />ZZ <br />934.37C 934.73C / 933.27TC / / l 1 1 /�'- - =__ 4` = _ \_�_\\\ <br />I 1 934.26 TC / 932.77 RIM 934.14 TC <br />934.59 C 935.45 TC - <br />' / - 14 I 934.76 GL / ��/ 933.37 C 935.15 GL \ \ 933.84 GL- <br />70 / /c i 935.50 TC I 934.60 TC 933.10 C < \ _ = - �� _ - - _ - - - = �\\\)) // // \ <br />933.00 GL/TC _ - - <br />/ � _ \ \ \�- -935 -=_ / \ <br />/ 934.10 GL _ - - - 935.45 TC - �� / <br />/ 934.71 TC - 935.15 GIL <br />93 935.30 TC I 9� 933.22 G L/TC \ \ - - - - - - <br />0 3 935.00 FFE 1 ' " 934.21 GL D �� � --tp_--- _ - - <br />935.00GIL I 934.64TC ° 03--_-_---- -_-_ / <br />/ I ' I 1 934.14 GL <br />v / i _ _ 934.14 TC / <br />III ' I / --- f=-== _J� 933.84GL\�---934.84TC <br />934.44 C (� {' \ 0 934.57 GL TC <br />935.50 C \\ <br />rn <br />i _ <br />933 � T� 934.95 C 934.97 <br />o * / c I I 935.00 GL 934.47 GL / / 933.00 RIM 0�3� 935.09 TC <br />I 9 I 934.84 TC / 954.79 GL <br />928.77 TC 932 <br />928.27 GL* / C601 I 934.34 GL 0 935.05 TC / 6 (TYP.) <br />ry 932.03 TC I <br />935.01 TC 934.55 GL C601 <br />931.53GL <br />934.51 934.26 G <br />° I 932 <br />931.75 TC <br />E D / c 931.57 TC <br />o �/ 931.25 GL ��', I / 935.65 TC <br />/ \ / 931.07 GL 931.79 TC 934.43 TC �� g3� / 935.15 GL 3� 933.00 RIM <br />931 930.79 GL C601 (TYP.) 934.13 GL 934.83 TC <br />/ 0 9 934.64 TC °� 'ter / / / 934.53 GL <br />N / 11931.52 TC 31 / 934.14 GL / 9� <br />/ / 931.02 GL 931.26 TC I 6 <br />/ (TYP.) / ^934.56 TC <br />N / C601 / / 930.76 GL 930.93 TC 930.04 GL , C601 933.85 TC C601 / i ' moo, _ _ _ ^ _ 934.26 GL <br />930.43 GL TC <br />// / 933.55 GL I / 934.N GL 935.15 G 3R _ / M � <br />I I 1931.78 TC 0 _ 930.00 CC 10 / IN 3 / rn <br />931.28 GL � 930.96 TC C601 \ 933.34 TC I / / g3 - / C U M <br />929.13 TC* /� 930.46 GL 933.04 GL I / _ / ce, �, <br />6, rn <br />928.63 GL* 931.96 TC 933 \ I / / 933.84 G ` � <br />^ <br />g 931.46 GL �_ co <br />930.56 TC <br />_ \ 930 g3931.15 TC <br />1_ 930.26 GL 931 I <br />930.65 GL 934.74 TC - - <br />_930 9g29 3 934.24 GL <br />31 00 930.20 EOF gI <br />933.00 RIM <br />n 0 <br />928 g3 933 4 a \ i \ 935.45 TC <br />928929 IN <br />gap 931 2 935.15 GL t <br />o INFILTRATION BASIN #2 g28 1 \\ 934.26 G \ _� ^ \ \ <br />U C / ?/ _ \ RASIN i Q7R nn Q�n r.Fni 1 I \ o� <br />w \ <br />I \ <br />E <br />1� <br />I ' • <br />I I <br />I <br />1 <br />F <br />° \7 ° _ "-- 935.15 GL \g35 / <br />/ OVER EXCAVATE APRROXIMATELY 1'. ��__' �\ 933 934 ° \\ ' \ / <br />TC <br />WHERE REQUIRED TO REACH SP SOILS. -c'� 933_ 934.34 TC ° \ �1 / 934.56 GL <br />BACKFILL WITH AMENDED SOIL MEDIA. g34 933.84 GL 934.26 GL x <br />• \ \ _ _ 935 0 \ - 9� 934.83 TC <br />_ 934.53 GL <br />935.65 TC 935 ° - x <br />\ \ I\_ 935.15 GL�_ �_X 0 <br />_ X 934.34 TC o <br />933.84 GL -X g3 935.09 TC x <br />934.84 TC X _ 934.79 GL <br />I - 934.57 GL X X - <br />934.50 G X X <br />7 <br />0 <br />LEGEND <br />R <br />- - - - 950 - - - - <br />EXISTING CONTOURS <br />PROPOSED CONTOURS - MAJOR INTERVAL <br />950 <br />PROPOSED CONTOURS - MINOR INTERVAL <br />949 <br />- - - - - - - <br />GRADE BREAK LINE <br />GRADE SLOPE <br />SILT FENCE <br />SEDIMENT ROLL <br />o°o°o°o <br />RIP -RAP / ROCK CONST. ENTRANCE <br />INFILTRATION BASIN <br />I <br />INLET PROTECTION <br />r <br />CONCRETE WASHOUT STATION <br />L J <br />(LOCATE DURING CONSTRUCTION) <br />. . . <br />950.00 TC <br />SPOT ABBREVIATIONS: <br />949.50 GL <br />TC - TOP OF CURB <br />GL - GUTTER LINE <br />B - BITUMUNOUS <br />G - GRADE <br />C - CONCRETE <br />CC-CURBCUT <br />EOF - EMERGENCY OVERFLOW <br />TS - TOP OF STEP <br />BS - BOTTOM OF STEP <br />IGRADING NOTES <br />(*) - EXISTING TO BE VERIFIED <br />WBL <br />TRANSPORTATION <br />FACILITY <br />13411 Fenway Blvd N <br />Hugo, MN 55038 <br />INDEPENDENT SCHOOL <br />DISTRICT #624 <br />4855 Bloom Avenue <br />White Bear Lake, MN 55110 <br />I <br />1. Tree protection consisting of snow fence or safety fence installed at the drip line shall be in place prior to beginning <br />any grading or demolition work at the site. WOLD ARCHITECTS <br />2. All elevations with an asterisk (*) shall be field verified. If elevations vary significantly, notify the Engineer for further AND ENGINEERS <br />instructions. <br />332 Minnesota Street, Suite W2000 <br />3. Grades shown in paved areas represent finish elevation. Saint Paul, MN 55101 <br />4. All construction shall be performed in accordance with state and local standard specifications for construction. woldae.com 1 651 227 7773 <br />EROSION CONTROL NOTES <br />1. <br />Owner and Contractor shall obtain MPCA-NPDES permit. Contractor shall be responsible for all fees pertaining to this <br />permit. The SWPPP shall be kept onsite at all times. <br />Larson <br />2. <br />Install temporary erosion control measures (inlet protection, silt fence, and rock construction entrances) prior to <br />Engineering, Inc. <br />beginning any excavation or demolition work at the site. <br />3524 Labore Road <br />3. <br />Erosion control measures shown on the erosion control plan are the absolute minimum. The contractor shall install <br />White Bear Lake, MN 55110 <br />temporary earth dikes, sediment traps or basins, additional siltation fencing, and/or disk the soil parallel to the contours <br />651.481.9120 (f) 651.481.9201 <br />as deemed necessary to further control erosion. All changes shall be recorded in the SWPPP. <br />www.larsonengr.com <br />4. <br />All construction site entrances shall be surfaced with crushed rock across the entire width of the entrance and from the <br />entrance to a point 50' Into the construction zone. <br />©2020 Larson Engineering, Inc. All rights reserved. <br />5. <br />The toe of the silt fence shall be trenched in a minimum of 6". The trench backfill shall be compacted with a vibratory <br />plate compactor. <br />6. <br />All grading operations shall be conducted in a manner to minimize the potential for site erosion. Sediment control <br />practices must be established on all down gradient perimeters before any up gradient land disturbing activities begin. <br />7. <br />All exposed soil areas must be stabilized as soon as possible to limit soil erosion but in no case later than 7 days after <br />the construction activity in that portion of the site has temporarily or permanently ceased. Temporary stockpiles without <br />significant silt, clay or organic components (e.g., clean aggregate stockpiles, demolition concrete stockpiles, sand <br />stockpiles) and the constructed base components of roads, parking lots and similar surfaces are exempt from this <br />requirement. <br />8. <br />The normal wetted perimeter of any temporary or permanent drainage ditch or swale that drains water from any portion <br />of the construction site, or diverts water around the site, must be stabilized within 200 lineal feet from the property <br />/ <br />edge, or from the point of discharge into any surface water. Stabilization of the last 200 lineal feet must be completed <br />within 24 hours after connecting to a surface water. Stabilization of the remaining portions of any temporary or <br />permanent ditches or swales must be complete within 7 days after connecting to a surface water and construction in <br />that portion of the ditch has temporarily or permanently ceased. <br />9. <br />Pipe outlets must be provided with energy dissipation within 24 hours of connection to surface water. <br />10. <br />All riprap shall be installed with a filter material or soil separation fabric and comply with the Minnesota Department of <br />Transportation Standard Specifications. <br />11. <br />All storm sewers discharging into wetlands or water bodies shall outlet at or below the normal water level of the <br />respective wetland or water body at an elevation where the downstream slope is 1 percent or flatter. The normal water <br />level shall be the invert elevation of the outlet of the wetland or water body. <br />12. <br />All storm sewer catch basins not needed for site drainage during construction shall be covered to prevent runoff from <br />entering the storm sewer system. Catch basins necessary for site drainage during construction shall be provided with <br />inlet protection. <br />13. <br />In areas where concentrated flows occur (such as swales and areas in front of storm catch basins and intakes) the <br />erosion control facilities shall be backed by stabilization structure to protect those facilities from the concentrated flows. <br />14. <br />Inspect the construction site once every seven days during active construction and within 24 hours after a rainfall event <br />greater than 0.5 inches in 24 hours. All inspections shall be recorded in the SWPPP. <br />I <br />15. <br />All silt fences must be repaired, replaced, or supplemented when they become nonfunctional or the sediment reaches <br />1/3 of the height of the fence. These repairs must be made within 24 hours of discovery, or as soon as field conditions <br />allow access. All repairs shall be recorded in the SWPPP. <br />16. <br />If sediment escapes the construction site, off -site accumulations of sediment must be removed in a manner and at a <br />frequency sufficient to minimize off -site impacts. <br />M <br />a' I 17. <br />All soils tracked onto pavement shall be removed daily. <br />18. <br />All infiltration areas must be inspected to ensure that no sediment from ongoing construction activity is reaching the <br />infiltration area and these areas are protected from compaction due to construction equipment driving across the <br />infiltration area. <br />I hereby certify that this plan, specifications or report <br />was prepared by me or under my direct supervision <br />19. <br />Temporary soil stockpiles must have silt fence or other effective sediment controls, and cannot be placed in surface <br />and that I am a duly licensed Professional Engineer <br />waters, including stormwater conveyances such as curb and gutter systems, or conduits and ditches unless there is a <br />under the laws of the state of Minnesota. <br />bypass in place for the stormwater. <br />20. <br />Collected sediment, asphalt and concrete millings, floating debris, paper, plastic, fabric, construction and demolition <br />Greg A. Buchal, P.E. <br />debris and other wastes must be disposed of properly and must comply with MPCA disposal requirements. <br />Date: 08.14.20 Lic. No.: 23793 <br />21 <br />Oil gasoline paint and any hazardous substances must be properly stored including secondary containment to <br />prevent spills, leaks or other discharge. Restricted access to storage areas must be provided to prevent vandalism. <br />Storage and disposal of hazardous waste must be in compliance with MPCA regulations. <br />22. External washing of trucks and other construction vehicles must be limited to a defined area of the site. Runoff must be <br />contained and waste properly disposed of. No engine degreasing is allowed onsite. <br />23. All liquid and solid wastes generated by concrete washout operations must be contained in a leak -proof containment <br />facility or impermeable liner. A compacted clay liner that does not allow washout liquids to enter ground water is <br />considered an impermeable liner. The liquid and solid wastes must not contact the ground, and there must not be <br />runoff from the concrete washout operations or areas. Liquid and solid wastes must be disposed of properly and in <br />compliance with MPCA regulations. A sign must be installed adjacent to each washout facility to inform concrete <br />equipment operators to utilize the proper facilities. <br />Revisions <br />Description Date Num <br />Addendum 1 <br />August 26, 2020 <br />1 <br />Addendum 2 <br />September 1, 2020 <br />2 <br />City Comments <br />September 30, 2020 <br />3 <br />24. Upon completion of the project and stabilization of all graded areas, all temporary erosion control facilities (silt fences, <br />hay bales, etc.) shall be removed from the site. Comm: 12196171 <br />25. All permanent sedimentation basins must be restored to their design condition immediately following stabilization of the Date: 08.14.2020 <br />site. Drawn: MTH <br />26. Contractor shall submit Notice of Termination for MPCA-NPDES permit within 30 days after Final Stabilization. Check: GAB North <br />27. Erosion control blankets are to be placed on all slopes 4:1 or greater. Reference sheet C500 for erosion control <br />blanket placement. GRADING AND <br />EROSION <br />NORTH <br />0 15 30 60 <br />CONTROL <br />PLAN <br />7 1 1 <br />0 <br />0 <br />0 <br />300 <br />