My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 10.08.20
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2020 PC Packets
>
PC Packet 10.08.20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 3:56:36 PM
Creation date
11/25/2020 3:51:32 PM
Metadata
Fields
Template:
Commissions
Meeting Date
10/8/2020
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />3 1 4 1 5 1 6 1 <br />7 <br />0 <br />R <br />� I <br />' CB <br />/ = TOP=930.5 <br />Q INV=926.4 NE <br />INV=926.3 SW SMH <br />TOP=930.4 <br />A NV=926.0 NE <br />INV=925.95 SE,SW <br />/ 12"PEP STS <br />co <br />W3 <br />aNiN°\ <br />c �UCF\ (A �i W <br />MN <br />\ \ \STscp\ <br />a <br />15 <br />I �J TO TOP=930.7 <br />/ a INV=927.5 NE,NW <br />a Q7 <br />78 LF j 12" FES-7 2 �� RCP @ 5 90% RIM: 929.60 C601 <br />1 <br />B o STMH-10 <br />0 ' (NEENAH R-1642) I RIM: 929.50 3 RAIN GUARDIAN-1 FES- <br />1 2 <br />NEW FRAME AND COVER . RIM: 93030 <br />INV (E): 925.00 C601 INV: 928.00 C601 <br />1 (NEENAH R-3067-C) c \ INV (N/S): 924.56* INV: 929.30 2 RIM: 927.17 C01 - <br />C602 8" GV/ BOX 4 <br />' INV=919. C602 <br />SA�sr�J WET -TAP 1 �1 8" DIP WM <br />s _ <br />/ <br />/ <br />/ <br />/ <br />/ <br />/ <br />/ <br />/ <br />/ <br />/ <br />s� / <br />/ <br />g31 � <br />936 INV= SAN _ <br />GGG, TOP=933.1 <br />\ $ INV=924.1 <br />4" RCP ST S �hQy 5 <br />UGG S 'SAN S (P)_ _ <br />\ c <br />FES-2 2 ce '�cp <br />INV:929.95 C601 TOP=932.5 <br />rua EX WM ►_ j o 6" HYDRANT INV=927.15 NW,SE \ <br />I 'TRCP 1g2 LF 6, VC I _ a 3 NV=927.1 NE <br />S\ <br />S � P ,.� 6" GV W/ BOX <br />s �oSE ' SCH• 40) @ 2 280 1 8" X 6" TEE C602 RAIN GUARDIAN-2 CB \ <br />4 ti % J = TOP=933.7 " <br />SW M U _ 8„ RIM: 933.16 INV_929.3 SE <br />_o I 85 ^ c _ 8" GV/ BOX 4 =WM INV: 932.16 121 INV=929.2 NW ` \s <br />NE / ro a LF 12�' RCP 8" X 8" TEE C602 C60 wv= <br />SW )> @ 0.5% <br />CB-1 (NEENAH R-3067) _ o \ <br />45° BEND <br />c RIM:932.92 3 SAN-1 <br />ro a C i 2s.9 INV:928.79 C601 5 SE: 928.02 RIM:934.48 <br />INV <br />IE � NEW FRAME STMH-2 (SE): o <br />'NW AND COVER 1 (NEENAH R-1642) C601 INV (W): 926.02 d <br />(NEENAH R-1642) C602 3 RIM: 934.60 45 LF 6" PVC (SCH. <br />� / I RIM: 930.10 INV: 928.37 40) @ 2.00% - - <br />Lo Q CONNECT TO EXIST C601 SUMP: 925.37 Z <br />/ 41 <br />J SANITARY SEWER: 4 45° BEND <br />� a <br />c INSTALL CLEAN -OUT C601 <br />_ - COORD W/ MECH. <br />a <br />/ 'INV: 921.65 ± (VERIFY) co- INV 928.92 COORD W/ MECH. �o <br />IMP/ TRA INV 930.75 11 \ <br />FFE' 935 00 (qRC 1ON FACILIT <br />/ V I H 10p_0",) Y <br />O � <br />IQv ' 45° BEND C] <br />I <br />6" HYDRANT <br />3 6" GV W/ BOX <br />P C602 8" X 6" TEE <br />1 <br />� <br />45° BEND <br />a <br />0 <br />�� / <br />J <br />RAIN GUARDIAN-3&4 <br />RIM:930.00 <br />INV:929.00 12 <br />-I <br />ce <br />To 929.3 <br />IN 926.35 S <br />I <br />C <br />' ?STRCP <br />S <br />w <br />COORD. W/ MECH. <br />INV: 927.00 <br />6" DOM W/ GV <br />6" GV/ BOX C602 ° <br />f 8"DIP wM <br />8" GV/ BOX 4 <br />8" X 6" TEE C602 _1 <br />450 BEND J I <br />ON <br />h <br />o' <br />\ Q <br />4 <br />FES-3 2 \ <br />INV: 928.00 C601 <br />i CB-3 (NEENAH R-3067) <br />3 RIM: 932.77 <br />_a INV:928.42 3 <br />SUMP:925.42 C601 <br />co <br />6" HYDRANT <br />6" GV W/ BOX 3 <br />8" X 6" TEE C602 <br />450 BEND <br />FES-4 2 \ <br />INV: 928.00 C601 \ <br />X`X 2 FES-5 \ <br />X C601 INV: 928.00 <br />X� \ <br />OcoX\ \ <br />J o ^ \ <br />0 <br />Cl) O1-0 <br />@ <br />I <br />j <br />O f <br />CB-4 (NEENAH R-2501) <br />RIM: 933.00 <br />INV: <br />928.65 3 <br />SUMP:925.65 C601 <br />IR <br />@ CB-6 (NEENAH R-2501) <br />U RIM: 933.00 <br />INV: 928.73 3 <br />SUMP:925.73 C601 <br />LL <br />J o <br />N <br />O X <br />L C601 <br />I z 0IR <br />CV o <br />o CB-8 (NEENAH R-3501-TB) in X <br />N a RIM: 933.04 <br />`'' U INV: 929.19 3 c <br />SUMP: C601 <br />30 O O X <br />SMH __ CB-5 (NEENAH R-2501) <br />-INS_8 <br />929.8 FES-6 2 RIM: 933.00 <br />INV_ 92s N �_ INV: 929.00 C601 3 <br />INV_ 924.3E 0 �_INV: 929.21 <br />s24.2s s cc LIE X I <br />SAN _ 24"RCP ST S V 0 n `UCE <br />TOP=92s. E _ <br />IN cs 2222 SAN S Top-9 %2 o �c ° CB-7 (NEENAH R-2501) X <br />TOP_ INv-92s.1 RIM: 933.00 <br />24" INV 92433 IN 924.8 NW X_ ° INV: 929.29 3 <br />CP <br />X <br />N, SW <br />E / S � � RCP ST � _ o C601 <br />_ S X O C� ce SAN p (PJ o X <br />Tol� <br />_ X _ O <br />WV_g25 s _ _ <br />INV-924 NE <br />5 W X _ X <br />SAN 932.9 _ XO <br />925 0 \?¢",PCP X _ <br />s SAN STS � � ° <br />TOP=931.7 \ _X _ O <br />INV=922.0 <br />i <br />F <br />X <br />X <br />CB _ X X X X X <br />TOP=932.0 _ <br />INV=925.65 SE,NW / <br />� 'PCP- <br />S <br />LEGEND <br />CTV <br />CABLE UNDERGROUND LINE <br />OE <br />ELECTRIC OVERHEAD LINE <br />UE <br />ELECTRIC UNDERGROUND LINE <br />FO <br />FIBER OPTIC UNDERGROUND LINE <br />GAS GAS <br />NATURAL GAS UNDERGROUND LINE <br />> > <br />SANITARY SEWER PIPE <br />» <br />STORM SEWER PIPE <br />T T <br />TELEPHONE UNDERGROUND LINE <br />-1-1-1 <br />WATERMAIN PIPE <br />» DT <br />DRAINTILE PIPE <br />O <br />STORM MANHOLE <br />O <br />CATCH BASIN <br />❑ <br />CURB INLET <br />An <br />FLARED END <br />O <br />SANITARY MANHOLE <br />HYDRANT <br />H <br />GATE VALVE & BOX <br />® <br />WATER SHUTOFF <br />LIGHT POLE <br />4" INSULATION, SEE UTILITY NOTE 9 <br />2" INSULATION, SEE UTILITY NOTE 9 <br />UTILITY NOTES <br />1. It is the responsibility of the contractor to perform or coordinate all necessary utility connections <br />and relocations from existing utility locations to the proposed building, as well as to all onsite <br />amenities. These connections include but are not limited to water, sanitary sewer, cable TV, <br />telephone, gas, electric, site lighting, etc. <br />2. All service connections shall be performed in accordance with state and local standard <br />specifications for construction. Utility connections (sanitary sewer, watermain, and storm sewer) <br />may require a permit from the City. <br />3. The contractor shall verify the elevations at proposed connections to existing utilities prior to any <br />demolition or excavation. <br />4. The contractor shall notify all appropriate engineering departments and utility companies 72 <br />hours prior to construction. All necessary precautions shall be made to avoid damage to existing <br />utilities. <br />5. Storm sewer requires testing in accordance with Minnesota plumbing code 4714.1109 where <br />located within 10 feet of waterlines or the building. <br />6. HDPE storm sewer piping shall meet ASTM F2306 and fittings shall meet ASTM D3212 joint <br />pressure test. Installation shall meet ASTM C2321. <br />7. All RCP pipe shown on the plans shall be MN/DOT class 3. <br />8. All PVC Schedule 40 pipe shall meet ASTM D2665 standards. The solvent welded joints shall <br />use ASTM F656 purple primer and ASTM D2564 cement. <br />9. Maintain a minimum of 7'/2 of cover over all water lines and sanitary sewer lines. Where 7'/2 of <br />cover is not provided, install 2" rigid polystyrene insulation (MN/DOT 3760) with a thermal <br />resistance of at least 5 and a compressive strength of at least 25 psi. Insulation shall be 8' wide, <br />centered over pipe with 6" sand cushion between pipe and insulation. Where depth is less than <br />5', use 4" of insulation. Insulation shall be installed on all watermain and storm crossings. <br />10. Install water lines 12" above sewers. Where the sewer is less than 12" below the water line (or <br />above), install sewer piping of materials approved for inside building use for 10 feet on each side <br />of the crossing. <br />11. All watermain piping shall be class 52 ductile iron pipe unless noted otherwise. <br />12. See Project Specifications for bedding requirements. <br />13. Pressure test and disinfect all new watermains in accordance with state and local requirements. <br />14. Sanitary sewer piping shall be PVC, SCH-40 for depths less than 12', PVC SDR-26 for depths <br />between 12' and 26', and class 52 D.I.P. for depths of 26' or more, unless otherwise noted. <br />15. Contractor to install water service into building and extend 12" above finished floor and cap pipe <br />with blind flange - see mechanical. <br />NORTH <br />0 15 30 60 <br />WBL <br />TRANSPORTATION <br />FACILITY <br />13411 Fenway Blvd N <br />Hugo, MN 55038 <br />INDEPENDENT SCHOOL <br />DISTRICT #624 <br />4855 Bloom Avenue <br />White Bear Lake, MN 55110 <br />WOLD ARCHITECTS <br />AND ENGINEERS <br />332 Minnesota Street, Suite W2000 <br />Saint Paul, MN 55101 <br />woldae.com 1 651 227 7773 <br />Larson <br />Engineering, Inc. <br />3524 Labore Road <br />White Bear Lake, MN 55110 <br />651.481.9120 (f) 651.481.9201 <br />www.larsonengr.com <br />© 2020 Larson Engineering, Inc. All rights reserved. <br />I hereby certify that this plan, specifications or report <br />was prepared by me or under my direct supervision <br />and that I am a duly licensed Professional Engineer <br />under the laws of the state of Minnesota. <br />Greg A. Buchal, P.E. <br />Date: 08.14.20 Lic. No.: 23793 <br />Revisions <br />Description <br />Date <br />Num <br />Addendum 1 <br />August 26, 2020 <br />1 <br />Addendum 2 <br />September 1, 2020 <br />2 <br />City Comments <br />September 30, 2020 <br />3 <br />Comm: 12196171 <br />Date: 08.14.2020 <br />Drawn: MTH <br />Check: GAB North <br />UTILITY <br />PLAN <br />0 <br />C400 <br />
The URL can be used to link to this page
Your browser does not support the video tag.