My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 10.08.20
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2020 PC Packets
>
PC Packet 10.08.20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 3:56:36 PM
Creation date
11/25/2020 3:51:32 PM
Metadata
Fields
Template:
Commissions
Meeting Date
10/8/2020
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />3 <br />1 4 1 5 1 6 1 7 , <br />R <br />1. <br />I_1 <br />B <br />10 <br />N <br />E <br />1 <br />F <br />2 <br />I <br />II <br />SYMBOL LEGEND <br />INFILTRATION BASIN <br />NEW SOD <br />NEW EROSION CONTROL BLANKET <br />SEE DETAIL 11/C601 <br />i LANDSCAPING NOTES <br />1. Landscape Contractor is responsible for coordination with the General Contractor, to protect the new <br />improvements on and off -site during landscape work activities. Report any damage to the General <br />Contractor immediately. <br />2. Plant size and species substitutions must be approved in writing prior to acceptance in the field. <br />3. Landscape Contractor is responsible for ongoing maintenance of all newly installed material until time of <br />owner acceptance. Any acts of vandalism or damage which may occur prior to owner acceptance shall be <br />the responsibility of the contractor. Contractor shall provide the owner with a maintenance program <br />including, but not limited to, pruning, fertilization and disease/pest control. <br />4. Landscape Contractor shall provide the owner with a watering schedule appropriate to the project site <br />conditions and to plant material growth requirements. <br />5. Landscape Contractor shall guarantee newly planted material through one calendar year from the date of <br />written owner acceptance. Plants that exhibit more than 10% die -back damage shall be replaced at no <br />additional cost to the owner. The contractor shall also provide adequate tree wrap and deer/rodent <br />protection measures for the plantings during the warranty period. <br />6. Planting areas shall be edged with 6" black vinyl edging and have 4" colored hardwood wood mulch over a <br />weed barrier fabric. <br />7. All trees not planted in landscaped areas shall have shredded hardwood mulch placed around the tree at 4' <br />diameter and 6" deep. <br />8. Restore all disturbed turf areas with 6" of good quality topsoil and seed unless otherwise specified. <br />9. Green space shown to the East and adjacent to the building in Alternates 1 & 3 shall be sod. <br />LANDSCAPING REQUIREMENTS <br />Building Area = 10,600 SF <br />Perimeter Length = 2,370 FT <br />OVERSTORY TREE REQUIREMENT: One coniferous tree for every 2,000 square feet of <br />building or one coniferous tree for every 100 feet of site perimeter, whichever is greater. <br />10,600 SF/ 2,000 SF = 6 2,370 FT/ 100 FT = 24 Required Amount = 24 <br />CONIFEROUS TREE REQUIREMENT: One coniferous tree for every 2,000 square feet of <br />building or one coniferous tree for every 200 feet of site perimeter, whichever is greater. <br />10,600 SF/ 2,000 SF = 6 2,370 FT/ 200 FT = 12 Required Amount = 12 <br />ORNAMENTAL TREE REQUIREMENT: One ornamental tree for every 2,000 square feet of <br />building or one ornamental tree for every 200 feet of site perimeter, whichever is greater. <br />10,600 SF/ 2,000 SF = 6 2,370 FT/ 200 FT = 12 Required Amount = 12 <br />SHRUB REQUIREMENT: One shrub for every 300 square feet of building or one shrub for <br />every 30 feet of site perimeter, whichever is greater. <br />10,600 SF/ 300 SF = 36 2,370 FT/ 30 FT = 79 Required Amount = 79 <br />PLANTING SCHEDULE <br />QTY <br />COMMON NAME <br />BOTANICAL NAME <br />SIZE <br />CONTAINER <br />OVERSTORY TREES, SEE DETAIL 6/C602 <br />- <br />J <br />5 <br />Red Maple <br />Acer Rubrum <br />2-1/2" Cal <br />B & B <br />- <br />9 <br />American Linden <br />Tilia Americana <br />2-1/2" Cal <br />B & B <br />10 <br />American Elm <br />Ulmus Americana <br />2-1/2" Cal <br />B & B <br />CONIFEROUS TREES, SEE DETAIL 6/C602 <br />���� <br />- <br />71 <br />7 <br />Black Hills Spruce <br />Picea Glauca Densata <br />6' Ht <br />B & B <br />- <br />7 <br />White Spruce <br />Picea Glauca <br />6' Ht <br />B & B <br />ORNAMENTAL TREES, SEE DETAIL 6/C602 <br />- <br />� <br />5 <br />Pagoda Dogwood <br />Corpus Alternifolia <br />2-1/2" Cal <br />B & B <br />- <br />7 <br />European Mountain Ash <br />Sorbus Aucuparia <br />2-1/2" Cal <br />B & B <br />SHRUBS, <br />SEE DETAIL 7/C602 <br />�1 <br />0 <br />40 <br />Korean Boxwood <br />Buxus Microphylla <br />12" Ht <br />#2 Pot <br />❑2 <br />® <br />14 <br />Arrowood Viburnum <br />Viburnum Dentatum <br />24" Ht <br />#2 Pot <br />�3 <br />20 <br />Canadale Gold Euonymus <br />Euonymus Fortunei <br />'Canadale <br />12" Ht <br />Pot <br />Gold' <br />O <br />10 <br />Emerald Green Arborvitae <br />Thuja Occidental is 'Smaragd' <br />24" Ht <br />#2 Pot <br />NORTH <br />0 15 30 60 <br />WBL <br />TRANSPORTATION <br />FACILITY <br />13411 Fenway Blvd N <br />Hugo, MN 55038 <br />INDEPENDENT SCHOOL <br />DISTRICT #624 <br />4855 Bloom Avenue <br />White Bear Lake, MN 55110 <br />WOLD ARCHITECTS <br />AND ENGINEERS <br />332 Minnesota Street, Suite W2000 <br />Saint Paul, MN 55101 <br />woldae.com 1 651 227 7773 <br />Larson <br />Engineering, Inc. <br />3524 Labore Road <br />White Bear Lake, MN 55110 <br />651.481.9120 (f) 651.481.9201 <br />www.larsonengr.com <br />© 2020 Larson Engineering, Inc. All rights reserved. <br />I hereby certify that this plan, specifications or report <br />was prepared by me or under my direct supervision <br />and that I am a duly licensed Professional Engineer <br />under <br />the laws/of the state of Minnesota. <br />Greg A. Buchal, P.E. <br />Date: 08.14.20 Lic. No.: 23793 <br />Revisions <br />Description <br />Date <br />Num <br />Addendum 1 <br />August 26, 2020 <br />1 <br />Addendum 2 <br />September 1, 2020 <br />2 <br />CityComments <br />September 30, 2020 <br />3 <br />Comm: 12196171 <br />Date: 08.14.2020 <br />Drawn: MTH <br />Check: GAB North <br />LANDSCAPE <br />PLAN <br />0 <br />0 <br />0 <br />0 <br />r <br />C500 <br />
The URL can be used to link to this page
Your browser does not support the video tag.