My WebLink
|
Help
|
About
|
Sign Out
Home
2021.02.01 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2021 CC Packets
>
2021.02.01 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2021 10:43:03 AM
Creation date
2/1/2021 10:40:55 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
2/1/2021
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
– 2 – January 15, 2021 <br />Task 1 Construction Documents: <br />Scope of Work: <br />-Bi-weekly meetings with the City Project Team to review project goals and progress <br />- Develop the detailed drawings and specifications required for the permitting and competitive Public Bidding of <br />the project <br />- Present the final design to the City for their review and approval <br />Present the final design to the building official for preliminary review <br />- 75% and 95% final review meeting with City, the entire Design Team and Project Manager <br />- Ongoing review of any design options with the Project Manager <br />Material selection with Project Manager and City Staff <br />- Detailed coordination with WSB and their project team. <br />Deliverables: <br />- Complete Construction Documents made up of detailed plans and specifications provided to the Project <br />Manager for review prior to Project Bidding, including alternates, etc. <br />Task 2 Bidding & Contract Award <br />Scope of Work: <br />- Assist the City in obtaining bids – we understand that you would like HCM, in coordination with WSB, to <br />manage the bidding process for the building. The City will receive and review bids. <br />- Develop Addenda to the Construction Documents and answer all inquiries about the project as required for <br />the competitive bidding of the project <br />- Work closely with the Project Manager on the bidding process <br />- Participate with the City in Pre-Bid Conference <br />- Review / Evaluate Bids with the Project Manager <br />Deliverables: <br />-Manage the bidding process and document distribution through an electronic bidding service, such as <br />QuestCDN, Franz Reprographics or similar. <br />-Issuance of Addenda as required, responding to contractor questions <br />- Review of substitution requests, etc. <br />Task 3 Construction Observation and Administration: <br />Scope of Work: <br />- Participate in bi-weekly construction mtgs. and review work for compliance with construction documents <br />- Appraise City of construction progress <br />- Review shop drawings and product submittals <br />- Answer all contractor inquiries regarding the design intent of the documents <br />- Work closely with the Project Manager regarding the construction work <br />- Review payment applications and prepare change orders <br />Review warranties, equipment manuals and related documents assembled by contractors <br />- Review the completed project 11 months after the date of occupancy and report any issues or warranty <br />problems to the contractor for correction <br />- Discuss the facility with the staff for feedback on operational issues <br />Deliverables: <br />- Timely Submittal and Shop Drawing reviews <br />- Review of Pay Applications <br />- Issue Appropriate Change Orders <br />- Punch-List Inspections - one (1) punch list walkthrough <br />Forward warranties, equipment manuals and related documents assembled by contractors <br />- Forward field drawings and specifications assembled by contractors <br />- 11 Month Post-Construction Warranty Review / Walk-through
The URL can be used to link to this page
Your browser does not support the video tag.