My WebLink
|
Help
|
About
|
Sign Out
Home
2021.02.01 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2021 CC Packets
>
2021.02.01 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2021 10:43:03 AM
Creation date
2/1/2021 10:40:55 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
2/1/2021
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br />Feasibility Report <br />2021 Downtown Improvements <br />City of Hugo, MN <br />WSB Project No. 015887-000 <br />TITLE SHEET <br />LETTER OF TRANSMITTAL <br />CERTIFICATION SHEET <br />TABLE OF CONTENTS <br />1 EXECUTIVE SUMMARY...................................................................................................1 <br />2 INTRODUCTION ...............................................................................................................2 <br />2.1 Authorization..........................................................................................................2 <br />2.2 Scope.....................................................................................................................2 <br />2.3 Data Available........................................................................................................2 <br />2.4 Project History........................................................................................................2 <br />3 EXISTING CONDITIONS ..................................................................................................3 <br />3.1 Surface...................................................................................................................3 <br />3.2 Drainage ................................................................................................................3 <br />3.3 Private and Non-City Utilities .................................................................................3 <br />3.4 Sanitary Sewer.......................................................................................................4 <br />3.5 Watermain..............................................................................................................4 <br />3.6 Adjacent Development and Associated Improvements .........................................4 <br />4 PROPOSED IMPROVEMENTS ........................................................................................5 <br />4.1 Surface...................................................................................................................5 <br />4.1.1 Roadway ....................................................................................................5 <br />4.1.2 Trails...........................................................................................................5 <br />4.1.3 Pedestrian Crossing...................................................................................5 <br />4.2 Drainage Improvements.........................................................................................5 <br />4.3 Utility Improvements ..............................................................................................6 <br />4.4 Coordinated Projects .............................................................................................6 <br />4.4.1 Lions Park Construction Coordination with the 2021 Street Improvement <br />Project........................................................................................................6 <br />4.4.2 CSAH 8 Water Reuse System Coordination with the 2021 Street <br />Improvement Project..................................................................................7 <br />4.5 Right-of-Way/Easements.......................................................................................7 <br />4.6 Permits/Approvals..................................................................................................7 <br />4.7 Construction Access/Staging.................................................................................8 <br />5 FINANCING.......................................................................................................................9 <br />5.1 Opinion of Probable Cost.......................................................................................9 <br />5.2 Funding..................................................................................................................9 <br />5.3 Preliminary Assessment Roll .................................................................................9 <br />6 NECESSITY AND EFFECTIVENESS.............................................................................11 <br />7 PROJECT SCHEDULE...................................................................................................12 <br />8 FEASIBILITY AND RECOMMENDATION......................................................................13 <br />Appendix A - Figures <br />Appendix B - Opinion of Probable Cost <br />Appendix C - Assessment Map & Preliminary Assessment Roll <br />Appendix D - Geotechnical Report
The URL can be used to link to this page
Your browser does not support the video tag.