My WebLink
|
Help
|
About
|
Sign Out
Home
2021.02.01 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2021 CC Packets
>
2021.02.01 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2021 10:43:03 AM
Creation date
2/1/2021 10:40:55 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
2/1/2021
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feasibility Report <br />2021 Downtown Improvements <br />City of Hugo, MN <br />WSB Project No. 015887-000 Page 4 <br />Metropolitan Council (Sanitary Sewer) <br />Comcast (Cable) <br />CenturyLink (Telecom) <br />Xcel Energy (Electric/Gas) <br />Consolidated Communications (Telecom) <br />White Bear Lake Area Schools (Fiber Optic) <br />Several of the existing private utilities are located on poles along the project streets. In some cases, the <br />poles will need to be relocated or held during construction. Any required relocations will be coordinated as <br />part of the final design process. <br />3.4 Sanitary Sewer <br />The properties within the project area are served by public sanitary sewer. No changes to the sewer <br />mains or services are proposed in this project. <br />Metropolitan Council Environmental Services (MCES) operates a forty-two inch (42”) sanitary sewer <br />interceptor which will be crossed by the extension of 147th Street. The pipe location will not impact the <br />construction of the roadway but will require coordination with and approvals from MCES during final <br />design. <br />3.5 Watermain <br />The properties within the project area are served by public City water utilities. An existing six-inch (6”) <br />watermain on Fitzgerald Avenue between 147th Street and Upper 146th Street has had a concerning <br />number of breaks in recent years and will be replaced as part of the project. Several properties are <br />served by this main and will require service reconnections to a new main. A branch service main from this <br />line enters the park under the existing City Hall parking lot and will be removed with the watermain <br />replacement. <br />In addition, the existing hydrants within the project area do not have shut off gate valves and will be <br />replaced with new hydrants that meet City standards. No other changes to the watermain or services are <br />proposed in this project. <br />3.6 Adjacent Development and Associated Improvements <br />The Hugo Gardens development currently under construction will include the realignment of Finale <br />Avenue between Upper 146th Street and 147th Street. The existing street segment will be removed as part <br />of the development project once the new alignment is constructed. <br />A storm water pond will be constructed by the development west of the project area, generally southeast <br />of the proposed Oneka Parkway and 147th Street intersection. This pond will receive surface water from <br />the Hugo Gardens development, the reconstructed Finale Avenue, portions of the proposed 147th Street, <br />and the proposed northwest Lions Park parking lot.
The URL can be used to link to this page
Your browser does not support the video tag.