Laserfiche WebLink
Feasibility Report <br />2021 Downtown Improvements <br />City of Hugo, MN <br />WSB Project No. 015887-000 Page 8 <br />4.7 Construction Access/Staging <br />The contractor will be responsible for providing access to all properties throughout the project. The <br />proposed methods of pavement rehabilitation will typically allow residents to drive on the roadway surface <br />during construction. Adequately signed detours will be identified to direct traffic around the construction <br />zones and notify users of the increased truck and construction activity. Detours will be used only if <br />absolutely necessary to ensure the safety of residents and construction workers alike. <br />Construction of the parking lot serving City Hall is proposed to be staged to allow for some level of <br />parking throughout the project.