My WebLink
|
Help
|
About
|
Sign Out
Home
2020.12.07 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2020 CC Packets
>
2020.12.07 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 9:47:03 AM
Creation date
3/4/2021 9:44:00 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
12/7/2020
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />Goodvie Trail Study <br />December 3, 2020 <br />pedestrian route was shown through Diamond Point West along Geneva Avenue. Concepts <br />between Geneva Avenue and Egg Lake Road were shown as a 5’ wide paved trail on both sides <br />of the road and a 10’ wide boardwalk/ 8’ wide trail on the west side. Marking the roadway with <br />share the road signage was also discussed. The Parks Commission recommended 5’ wide paved <br />trails on both sides of the roadway for the entire corridor be pursued, or at least on the west side. <br /> <br />At the Parks Commission meeting of September 16, 2020, Candace Amberg from WSB <br />presented 30% plans that included an 8’ trail on the west side of Goodview Avenue with a 5’ <br />wide buffer. These included cost estimates. Between 145th Street and Geneva Avenue, <br />construction was estimated to cost between $1.4 million and $1.8 million. Between Geneva <br />Avenue and Egg Lake Road, construction was estimated to cost between $500,000 and $650,000. <br />These costs included estimates for the acquisition of trail easements and wetland replacement, <br />but did not include soil corrections. The Parks Commission recommended approval of the study, <br />but did not want to move forward with construction unless grant funding becomes available. <br /> <br />4. CONCLUSION <br /> <br />The Parks, Recreation, and Open Space Commission recommends approval of the Goodview <br />Avenue Trail Study and Preferred Layout. <br /> <br /> <br /> <br /> <br />ATTACHMENTS <br />1) Goodview Avenue Trail Feasibility Study Concepts dated August 14, 2020 <br />2) Goodview Trail Preferred Layout dated September 11, 2020 <br />3) Feasibility Plan Memo dated September 16, 2020 <br />4) Estimate of Probable Costs dated September 16, 2020 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.