My WebLink
|
Help
|
About
|
Sign Out
Home
2020.12.07 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2020 CC Packets
>
2020.12.07 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 9:47:03 AM
Creation date
3/4/2021 9:44:00 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
12/7/2020
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Goodview Avenue Trail Feasibility | Overall Trail Network <br />Hugo, Minnesota <br />July 10, 2020 | WSB Project number: 016114-000 <br />OPTIONS FOR PEDESTRIAN ROUTES ALONG GOODVIEW AVE N FROM 145TH ST N TO GOODVIEW AVE N WERE EXPLORED <br />BUT DUE TO NUMEROUS IMPACTS AND HIGH CONSTRUCTION COSTS, THESE OPTIONS WERE NOT CARRIED FORWARD <br />INTO THE FEASIBILITY PLAN FOR CONSIDERATION AT THIS TIME. <br />Scale in Feet <br />400’0’ 100’200’ <br />POTENTIAL FUTURE <br />TRAIL CONNECTION <br />FROM EGG LAKE <br />ROAD TO ONEKA LAKE <br />BLVD N AND FURTHER <br />NORTH PER CITY 2040 <br />COMPREHENSIVE TRAILS <br />PLAN <br />FEASIBILITY OVERVIEW <br />EXISTING PHOTOS <br />P <br />T <br />F <br />HANIFL PARKHANIFL PARK <br />RICE LAKERICE LAKE <br />PROPOSED TRAIL CONNECTION <br />BETWEEN GOODVIEW AVE N AT <br />GENEVA AVE N AND HANIFL PARK <br />AS PART OF NEW DEVELOPMENT <br />P <br />B <br />G <br />A <br />E G G L A K E R D N <br />EGG <br />L <br />A <br />K <br />E <br />R <br />D <br />N <br />145TH ST N145TH ST N <br />DIAMOND DIAMOND <br />POINT PARKPOINT PARK <br />EGG LAKE ROAD: EXISTING WIDE PAVED <br />SHOULDERS AND A CONCRETE WALK ON <br />SOUTH SIDE BETWEEN GOODVIEW AVE N <br />AND HWY 61 PROVIDE CONNECTION TO THE <br />HARDWOOD CREEK REGIONAL TRAIL <br />EGOODVIEW AVE NGGGGGGGGGGGGGGGOGOGOGOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOODDDDDDDDDDDDVDDVVVDVDVVVVVVVVVVVVVVVVIIIIIIIIEEEEEEEWWWWEWEWWWWWWWWWWWWWWWWWWWWWWWWW AAWAWAAAW AWAWAAAAAVAAAAVAAAAVAVVAAAVVVVVVVVVVVVVVVVVVVVVVEEEEEEEEEENNNNNNNNNNNNNNGOODVIEW AVENGOODVIEW AVE N FROM 145TH <br />ST N TO GENEVA AVE N: DUE TO <br />CONSIDERABLE IMPACTS AND COSTS, <br />THIS ROUTE WAS NOT CARRIED <br />FORWARD AS A FEASIBLE OPTION FOR <br />CONSIDERATION AT THIS TIME <br />G <br />S <br />C <br />T <br />GOODVIEW AVE N FROM GENEVA <br />AVE N TO EGG LAKE RD: ROUTE <br />DEEMED AS FEASIBLE OPTION FOR <br />CONSIDERATION <br />G <br />A <br />D <br />C <br />NEIGHBORHOOD ON-STREET <br />ROUTE: ROUTE DEEMED <br />AS FEASIBLE OPTION FOR <br />CONSIDERATION PER CITY 2040 <br />COMPREHENSIVE TRAILS PLAN <br />N <br />R <br />A <br />C <br />C <br /> GENEVA AVE NGGGGGEEEEENNNNNEEVVVVVVVAAAAAAAAAAAAAVVVVAAAAAAAAAAAVVVVVVVVVVAAAAAEEEEEENNNNGOODVIEW AVE N LOOKING SOUTH AT 145TH ST PED RAMP AT 145TH ST & GOODVIEW AVE N INTERSECTION GOODVIEW AVE N LOOKING SOUTH
The URL can be used to link to this page
Your browser does not support the video tag.