Laserfiche WebLink
Ms. Rachel Juba <br />February 5, 2021 <br />Page 2 <br />Utility Plan <br />4. As identified in the City's Comprehensive Water Supply and Distribution Plan, a 24" trunk <br />watermain is proposed to be extended north from the water tower location. The construction <br />plans identify this 24" trunk watermain being extended through the development to the <br />northern property line, with the City of Hugo paying for oversizing costs. <br />5. The City's Comprehensive Sanitary Sewer Plan identifies the way in which properties are to <br />be served by sanitary sewer. A sanitary sewer connection to the MCES Interceptor is <br />identified at 165th Street with a 36" trunk main, providing service to a large portion of land east <br />of TH 61. The proposed plan identifies a connection to the MCES Interceptor approximately <br />1320 feet south of 1651h Street which will ultimately make the development of the area more <br />feasible considering the watermain is at the southwestern portion of the site and the <br />connection to the MCES interceptor per the comprehensive sanitary sewer plan is <br />approximately 1320 feet from the northern border of the development. <br />6. Due to the size of the and projected long-term flow anticipated in this sewer extension an <br />Environmental Assessment Worksheet (EAW) would normally be required, however the City <br />had prepared an Alternative Urban Areawide Assessment (AUAR) for the Everton Area in <br />2001. This plan has been updated every 5 years and contains the necessary information to <br />fulfill the EAW requirements. <br />7. This trunk sanitary sewer is proposed to be constructed on the north property line of the <br />development. The applicant has provided signed drainage and utility easements for the <br />adjacent property to the north. The applicant will also be required to provide drainage and <br />utility easements to the allow the sanitary sewer to be extended to the northeast up to 165th <br />Street. Easements through parcel (PIN 0803121340002) will ensure the ability to extend the <br />sewer up to 165th Street should the need arise. <br />8. Staff has asked MCES what process, if any, is required for the change in location of the <br />connection to the MCES Interceptor from what is identified in the Comprehensive Sanitary <br />Sewer Plan. <br />Stormwater Management/Wetlands <br />9. Applicant is meeting rate control and water quality stormwater requirements through multiple <br />stormwater ponds adjacent to and hydraulically connected to the wetlands throughout the <br />property. <br />10. The City requested the development use water reuse to provide the required water quality <br />volume however the applicant has provided calculations and arguments which demonstrates <br />why this isn't feasible due to site constraints. Due to the minimal grade change across the <br />site and the presence of wetlands throughout the site the stormwater ponds are hydraulically <br />connected with the wetlands which restricts the amount of water which can be drawn from a <br />stormwater pond for irrigation. For other developments that utilize a water reuse system, the <br />ponds can draw down 3-4 feet without any negative consequences, however due to the <br />hydraulic connection of the ponds and wetland, even drawing the pond down 6" has negative <br />impacts on the wetlands. The applicant provided calculations showing that if water reuse <br />were implemented, the wetlands would likely only receive water 1-2 times per year which <br />would cause a loss of the onsite wetlands and would not be permitted under WCA <br />regulations. <br />11. The applicant has applied for and received Conditional Approval Pending Receipt of Changes <br />(CAPROC) for a Rule I Permit with RCWD for work adjacent to and within JD 3. All changes <br />requested by RCWD will need to be addressed. <br />12. The applicant is showing that all proposed lots meet the City's freeboard requirements. <br />13. Additional detailed redline drainage comments have been provided to the applicant and will <br />need to be addressed prior to the issuance of the stormwater permit. <br />14. A wetland delineation on the parcel was approved during the fall of 2018. <br />S:\Users\R_Juba\DEVELOPMENT PROJECTS\The Meadows at Hugo\Preliminary Plat and <br />PUD\Engineer Comments\LTR-rjuba-Meadows at Hugo Pre Plat-PUD - 20210204.docx <br />