My WebLink
|
Help
|
About
|
Sign Out
Home
2021.04.05 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2021 CC Packets
>
2021.04.05 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2021 11:06:31 AM
Creation date
4/16/2021 10:58:59 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
4/5/2021
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />White Bear Lake School District 3 <br />storm drainage improvements shall comply with the City’s adopted specification book and the <br />reasonable direction of City staff. <br /> <br /> 3. Authorization to Proceed with Construction. Developer agrees not to <br />commence any grading, utility or street work within the Project until the following are completed: <br /> 1) Construction plans are approved by the City and distributed. <br /> 2) Pre-construction conference is held. <br /> 3) Notice to Proceed is issued. <br /> <br /> 4. Construction Observation. The City, for its benefit, will provide staff of <br />its choosing to provide construction observation for the Improvements outlined in this Agreement. <br />All costs associated with construction observation and inspection will be the responsibility of the <br />Developer. The Developer shall allow City staff and City consultants access to the Project to allow <br />for this work to occur. <br /> <br /> 5. Miscellaneous Requirements. <br /> <br /> a) Property Corners: All property corners as identified on the Project <br />must be monumented with iron surveyor's pipes by the Developer prior to final project acceptance, <br />as defined in paragraph 7 of this Agreement. <br /> b) Drainage Easements: Drainage easements shall be dedicated on <br />the Project so as to cover any wetlands and stormwater ponding areas located below the 100-year <br />high water levels. <br /> c) Soils Testing: Soils inspection and compaction testing by a <br />registered professional engineer shall be accomplished on all lots where filling is required, in <br />accordance with the approved Grading, Drainage, and Erosion Control Plan. A minimum of one <br />(1) compaction test for all developed lots shall be obtained for every two (2) foot increment of fill <br />that is placed. A summary of all inspections and compaction tests for all developed lots shall be <br />provided to the City upon completion of the grading and shall be provided for a respective lot prior <br />to the issuance of a building permit for such lot. <br /> d) Private Utilities: All private utilities that are installed, including <br />electricity, telephone, natural gas and cable television, shall be installed underground. <br /> e) Mailboxes: Developer shall coordinate mailbox locations with the <br />United States Postal Service. <br /> f) Street Lights: Street lights shall be installed within the Project <br />according to the Street Lighting Plan, which will first be approved by the City Engineer. Developer <br />shall also submit its Street Lighting Plan to the applicable power company for its review, comment <br />and approval. The installation of the street lights shall be coordinated with the applicable power
The URL can be used to link to this page
Your browser does not support the video tag.