My WebLink
|
Help
|
About
|
Sign Out
Home
2021.04.05 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2021 CC Packets
>
2021.04.05 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2021 11:06:31 AM
Creation date
4/16/2021 10:58:59 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
4/5/2021
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />White Bear Lake School District 4 <br />company so that the street light system is installed, constructed and operated in such a manner as <br />will harmoniously exist with other street lights within the area. <br /> g) Working Hours: Construction activity, including equipment <br />startup and fueling, can only occur between the hours of 7:00 a.m. and 7:00 p.m. Monday through <br />Friday; 8:00 a.m. and 5:00 p.m. on Saturdays; at no time on Sundays or holidays. <br /> h) Street Sweeping: Developer shall sweep and/or otherwise clean all <br />streets, as needed, within and adjacent to the Development property as a result of construction <br />activities associated with the Project until final acceptance of the Improvements. If the streets are <br />not maintained in a manner acceptable to the City, after reasonable notice to the Developer the City <br />will arrange for the street sweeping at Developer’s cost. <br /> i) Placement of Bituminous Wear Course: The bituminous wear <br />course can be placed on all streets once all of the following have occurred: <br /> 1. When deemed necessary by the City Engineer. <br /> 3. City staff or its assignees have visually inspected all <br />roadways and curb within the Development, and any repairs <br />necessary as a result of said inspection are complete and <br />written approval issued. <br /> <br /> 6. Project Completion: The Improvements listed herein on Exhibit A, including <br />street, sanitary sewer, storm sewer, and municipal water, shall be completed subject to the approval <br />of the City in accordance with the approved plans. All Improvements shall be substantially <br />completed to the reasonable satisfaction and approval of the City within twelve (12) months of the <br />execution of this Agreement. Substantial completion shall consist of all work with the exception of <br />placement of the bituminous wear course and completion of the final punchlist. The Developer <br />shall be excused from the strict completion date set forth herein if written notice is received from <br />the Developer of the existence of causes over which the Developer has no control which will delay <br />the completion of the work and approved in writing by the City. In that event, the City may extend <br />the date or dates herein specified. <br /> <br /> 7. Project Acceptance: Final project acceptance will be considered by the City <br />Council once the following have been completed: <br /> <br /> (a) All Improvements are installed according to the approved plans. <br /> (b) All punchlist items are completed. <br /> (c) All Record Drawing information has been provided to the City to its <br />satisfaction. <br /> (d) Escrow account for City costs and fees is current in accordance with the <br />provisions of this Agreement. <br /> (e) The City receives confirmation via lien waivers that contractors or other
The URL can be used to link to this page
Your browser does not support the video tag.