My WebLink
|
Help
|
About
|
Sign Out
Home
2021.04.05 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2021 CC Packets
>
2021.04.05 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2021 11:06:31 AM
Creation date
4/16/2021 10:58:59 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
4/5/2021
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />White Bear Lake School District 16 <br /> <br />EXHIBIT C <br /> <br />ESCROWS, FEES AND CHARGES <br /> <br /> <br /> a) Escrow for City Costs and Fees. Developer shall deposit sufficient <br />escrow with the City as outlined in Section A. 1. The required beginning balance in the account is <br />calculated at $_______________. This sum is calculated to be four percent (4%) of the estimate of <br />the required Improvements to be installed to serve the development, plus $5,000 which is the <br />minimum balance required in the account. <br /> <br /> b) Cash Escrow or Letter of Credit. N/A <br /> <br /> c) Storm Water Trunk Fee. The Developer shall pay the City a Storm <br />Water Trunk Fee in the amount of $_____________. This sum is calculated to be $0.07 per square <br />foot for the _______________ square feet of net developable area within the Project. This fee shall <br />be paid before the building permit is issued by the City. <br /> <br /> d) Storm Water Ponding Fee. The storm water ponding requirement has <br />been met by the Developer through the incorporation of on-site ponding. No storm water ponding <br />fee will be applied. <br /> <br /> e) Snow Plowing. Developer agrees to pay a one-time lump sum cash <br />escrow to the City to cover the cost of snow plowing the roads within the project, during the first <br />snow season, before the roads are formally accepted by the City of $.50 per lineal foot. The <br />Developer shall post a cash escrow with the City in the amount of $__________ ($0.50 x _____ = <br />$_________). <br /> <br /> f) Sealcoating. The Developer shall post a one-time lump sum cash <br />escrow with the City in the amount of $________ to cover the cost of the first sealcoating of the <br />streets in the Project. This sum is calculated to be $4.00 per foot for the ___________ feet of <br />streets within the Project. <br /> <br /> g) Park Dedication. N/A <br /> <br /> h) Cul-de-sac Escrow. N/A <br /> <br />i) Escrow for Street Signage. N/A. <br /> <br /> j) WCA Escrow. N/A
The URL can be used to link to this page
Your browser does not support the video tag.