My WebLink
|
Help
|
About
|
Sign Out
Home
2021.04.19 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2021 CC Packets
>
2021.04.19 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2021 10:22:59 AM
Creation date
4/19/2021 10:18:02 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
4/19/2021
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Rachel Juba <br />April 5, 2021 <br />Page 2 <br />Ditch 3. Water quality requirements are met by a combination of both the existing Hugo <br />Gardens stormwater pond and water reuse that is proposed for Lions Park. The Hugo <br />Gardens stormwater pond was oversized in order to provide the stormwater treatment for <br />Lions Park and the City street reconstruction project. Water reuse is proposed to provide any <br />irrigation that may be required for Lion’s Park and will be constructed congruently with the <br />street construction project and Lion’s Park . <br />6. Additional stormwater plan and model comments have been provided to applicant and will <br />need to be addressed in future submittals for documentation and permitting purposes. <br />7. Since the project will be bid jointly with the 2021 Downtown Improvement Project, an overall <br />Stormwater Pollution Prevention Plan for both projects will be included in the 2021 Downtown <br />Improvement Project plans. <br /> <br /> <br />Thank you for the opportunity to provide comments on this project. Additional comments may be <br />necessary following the review of the responses to these. If you have any questions, please do <br />not hesitate to contact me at 651-286-8463. <br /> <br />Sincerely, <br /> <br />WSB <br /> <br /> <br /> <br />Mark Erichson, PE <br />City Engineer <br /> <br />cc: Scott Anderson, Public Works Director (email only) <br /> Liz Finnegan, Senior Engineering Technician (email only)
The URL can be used to link to this page
Your browser does not support the video tag.