My WebLink
|
Help
|
About
|
Sign Out
Home
2021.05.03 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2021 CC Packets
>
2021.05.03 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2021 4:18:38 PM
Creation date
4/29/2021 4:11:30 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
5/3/2021
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />S:\Users\R_Juba\DEVELOPMENT PROJECTS\The Meadows at Hugo\Final Plat\LTR-r juba-Meadows at Hugo Pre Plat-PUD - 20210429.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM April 29, 2021 <br /> <br /> <br /> <br /> <br />Ms. Rachel Juba <br />Community Development Director <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br /> <br />Re: Meadows at Hugo <br />Final Plat Review <br /> WSB Project No. 013597-000 <br /> <br />Dear Ms. Juba: <br /> <br />We have reviewed the Preliminary Plat submittal for the Meadows at Hugo. We have reviewed <br />the following information related to this application: <br /> <br />• The Meadows at Hugo Final Plat Submittal dated March 26, 2021 by Civil Site Group <br />• Final Plat submitted April 29, 2021 <br />• The Meadows at Hugo Preliminary Plat/PUD Submittal dated January 26, 2021 by Civil <br />Site Group <br />• The Meadows at Hugo Stormwater Management Report dated January 26, 2021 by Civil <br />Site Group <br />• The Meadows at Hugo Preliminary Plat dated January 26, 2021 by Civil Site Group <br />• The Meadows at Hugo Geotechnical Report dated December 4, 2020 by Haugo <br />GeoTechnical Services <br />• The Meadows at Hugo Preliminary Plat/PUD Narrative dated January 26, 2021 by Civil <br />Site Group <br />• Phasing Plan <br /> <br /> <br />Based on the review of the documents, we offer the following comments related to this <br />application: <br /> <br />General/Access <br /> <br />1. The subject property is located north of 159th Street, south of 165th Street and east of Water <br />Tower No. 3. The parcel doesn’t have any public roadway frontage at this time, however with <br />the Oneka Place Development, the City had received Outllot J that would allow for access to <br />the subject property. The proposed access road to the site extends through this Outlot and <br />through the City owned property where our water tower resides. <br />2. The extension of the roadway to the development site would be the developer’s <br />responsibility. The intersection at this location would remain with no stop controls at 159th <br />Street and a stop condition on Farnham Avenue from the north and south. <br />3. With access proposed from Farnham Avenue, the proposed plan does show future roadway <br />connections to the north, which will ultimately connect with 165th Street. Staff concurs with <br />not providing access to the property to the east as it is guided industrial, however utilities will <br />be extended to this property. <br />4. Outlot A will be required to be in a drainage and utility easement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.