Laserfiche WebLink
<br />S:\Users\R_Juba\DEVELOPMENT PROJECTS\Oneka Lake Reserve\Pre Plat and PUD\Engineers Memo Oneka Lake Reserve Townhomes 050621.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM May 6, 2021 <br /> <br /> <br /> <br /> <br />Ms. Rachel Juba <br />Community Development Director <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br /> <br /> <br />Re: Preliminary Plat, Site Plan, Vacation and Rezoning Review <br /> Oneka Lake Reserve Townhomes <br /> WSB Project No. 016329-000 <br /> <br /> <br />Dear Ms. Juba: <br /> <br />We have reviewed the site plan submittal for the proposed Oneka Lake Reserve townhome <br />development located north of 150th Street at Generation Avenue. In particular, we have reviewed <br />the following plans related to this particular request: <br /> <br />• Civil Plan Set revised 3/12/21 by Elan Design Lab <br />• Stormwater Management System Calculations and Narrative dated 3/12/21 by Elan <br />Design Lab <br />• Preliminary Plat dated 4/28/21 <br /> <br />Based on the review of the above documents, we offer the following comments related to this <br />application: <br /> <br />Grading, Street, and Utility Plans <br /> <br />1. The site is proposed to have a single access extending north from the existing tee <br />intersection of 150th Street North and Generation Avenue North. One proposed building with <br />four units abuts and accesses 150th Street North with 4 individual residential driveways. The <br />proposed access locations are acceptable. <br />2. Water service is available to the development from an existing 8” water service stub <br />extending north from the intersection of 150th Street North and Generation Avenue North. <br />The applicant will be required to create an 8” loop within the development for residential <br />service and fire protection. There is one proposed building with four units abutting 150th <br />Street North will be serviced with four existing individual residential water service stubs. <br />3. Streets and storm sewer are proposed to be private, however sanitary sewer and watermain <br />will be public and contained within drainage and utility easements. <br />4. Sanitary sewer service is available to the site from an existing 8” sanitary service stub <br />extending north from the intersection of 150th Street North and Generation Avenue North. <br />There is one proposed building with four units abutting 150th Street North that will be serviced <br />with four existing individual residential sanitary service stubs. <br />5. Grading is proposed in the drainage and utility easement area on the properties directly to <br />the north to expand the size of this stormwater pond. Staff will need to continue to work with <br />the applicant on the detailed grading of this pond to minimize impacts. <br />6. Drainage and Utility easements are appropriately shown over all of Outlot A.