My WebLink
|
Help
|
About
|
Sign Out
Home
2021.06.07 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2021 CC Packets
>
2021.06.07 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2021 10:59:27 AM
Creation date
6/4/2021 2:55:48 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
6/7/2021
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Rachel Juba <br />May 6, 2021 <br />Page 2 <br />7. Detailed redline comments have been provided on the plans and sent to the applicants <br />engineer so they can be addressed in future submittals. <br /> <br />Stormwater Management <br /> <br />8. The stormwater water quality requirements are proposed to be met through the use of water <br />reuse and the purchase of volume reduction credits from the City. With the current proposed <br />stormwater management onsite, 53% of new/reconstructed impervious (1.8 ac) is not treated <br />onsite which requires the purchase of 3.1 volume reduction credits. At $8,250 a credit, the <br />total credit purchase cost is calculated to be $25,575. <br />9. Water reuse has been evaluated for the pond internal to the site, however the larger basin to <br />the north is has much larger volume and will be required to be evaluated for suitability as the <br />source for stormwater reuse. <br />10. Additional stormwater plan and model comments have been provided to applicant and will <br />need to be addressed in future submittals for documentation and permitting purposes. <br />11. A stormwater maintenance agreement and will be required for the stormwater basins on the <br />site. <br /> <br /> <br />Thank you for the opportunity to provide comments on this project. Additional comments may be <br />necessary following the review of the responses to these. If you have any questions, please do <br />not hesitate to contact me at 651-286-8463. <br /> <br />Sincerely, <br /> <br />WSB <br /> <br /> <br /> <br />Mark Erichson, PE <br />City Engineer <br /> <br />cc: Scott Anderson, Public Works Director (email only) <br /> Liz Finnegan, Senior Engineering Technician (email only)
The URL can be used to link to this page
Your browser does not support the video tag.