Laserfiche WebLink
<br /> <br />Acres of Bald Eagle 4 <br /> e) Mailboxes: Developer shall coordinate mailbox locations with the <br />Postmaster. <br /> f) Street Lights: Street lights shall be installed within the plat <br />according to a street lighting plan which will first be approved by the City Engineer. Developer <br />shall also submit its street lighting plan to the applicable power company for its review, comment <br />and approval. The installation of the street lights shall be coordinated with the applicable power <br />company so that the street light system is installed, constructed and operated in such a manner as <br />will harmoniously exist with other street lights within the area. <br /> g) Working Hours: Construction activity, including equipment <br />startup and fueling, can only occur between the hours of 7:00 a.m. and 7:00 p.m. Monday through <br />Friday; 8:00 a.m. and 5:00 p.m. on Saturdays; at no time on Sundays or holidays. <br /> h) Street Sweeping: Developer shall sweep and/or otherwise clean all <br />streets, as needed, within and adjacent to the Development property as a result of construction <br />activities associated with the plat until final acceptance of the improvements. If the streets are not <br />maintained in a manner acceptable to the City, the City will arrange for the street sweeping at <br />Developer’s cost. <br /> i) Placement of Bituminous Wear Course: The bituminous wear <br />course can be placed on all streets once all of the following have occurred: <br /> 1. A Certificate of Occupancy has been issued for at least 75% <br />of the lots or a cash escrow in the amount of $10,000 has <br />been deposit with the City which will be held until 75% of <br />the lots have received Certificates of Occupancy. At the <br />City’s discretion, the wear course may be placed prior to <br />having 75% occupancy, or as approved by the City Engineer. <br /> If applicable, the warranty period shall be extended an <br />additional one (1) year for a total of two (2) years from final <br />acceptance. <br /> 2. The base course on all streets has been in place for at least <br />one full freeze-thaw cycle. or as approved by the City <br />Engineer. <br /> 3. City staff or its assignees have visually inspected all <br />roadways and curb within the Development, and any repairs <br />necessary as a result of said inspection are complete and <br />written approval issued. <br /> <br /> 6. Project Completion: All work for improvements listed herein on Exhibit A, <br />including street, sanitary sewer, storm sewer, and municipal water, shall be completed subject to the <br />approval of the City in accordance with the approved plans. All improvements shall be <br />substantially completed to the reasonable satisfaction and approval of the City within twelve (12)