Laserfiche WebLink
WSB Project:Design By:BFC <br />Project Location:CITY OF HUGO Checked By:PTH <br />City Project No.: <br />WSB Project No:018363-000 Date:6/14/2021 <br />Item <br />No. <br />MN/DOT <br />Specification <br />No. <br />Description Unit <br />Estimated <br />Total <br />Quantity <br />Estimated <br />Unit Price Estimated Total Cost <br />1 2105.601 DEWATERING LS 1 $20,500.00 20,500.00$ <br />2 2503.602 CONNECT TO EXISTING MANHOLES EACH 1 $2,000.00 2,000.00$ <br />3 2503.602 CONNECT TO EXISTING SANITARY SEWER EACH 1 $1,000.00 1,000.00$ <br />4 2503.602 4" SEWER SERVICE CLEAN-OUT EACH 1 $500.00 500.00$ <br />5 2506.602 CASTING ASSEMBLY (SANITARY)EACH 9 $700.00 6,300.00$ <br />6 2506.602 CHIMNEY SEAL EACH 9 $350.00 3,150.00$ <br />7 2503.603 8" PVC PIPE SEWER - SDR 35 LIN FT 1590 $40.00 63,600.00$ <br />8 2503.603 8" OUTSIDE VERTICAL DROP (INCL. FITTINGS)LIN FT 15 $125.00 1,875.00$ <br />9 2503.603 TELEVISE SANITARY SEWER LIN FT 1590 $2.50 3,975.00$ <br />10 2506.603 CONST 48" DIA SAN SEWER MANHOLE, TYPE 301B LIN FT 110 $400.00 44,000.00$ <br />3% CONTINGENCY 7,345.00$ <br />4% INDIRECT COSTS 6,169.80$ <br />SCHEDULE A - SANITARY SEWER IMPROVEMENTS SUB-TOTAL 160,414.80$ <br />OPINION OF PROBABLE COST <br />121ST STREET AND ACRES OF BALD EAGLE <br />A. SANITARY SEWER IMPROVEMENTS <br />1 of 5 K:\018363-000\Quantity\Preliminary\FR QUANTITES-061621