Laserfiche WebLink
WSB Project:Design By:BFC <br />Project Location:CITY OF HUGO Checked By:PTH <br />City Project No.: <br />WSB Project No:018363-000 Date:6/14/2021 <br />Item <br />No. <br />MN/DOT <br />Specification <br />No. <br />Description Unit <br />Estimated <br />Total <br />Quantity <br />Estimated <br />Unit Price Estimated Total Cost <br />OPINION OF PROBABLE COST <br />121ST STREET AND ACRES OF BALD EAGLE <br />A. SANITARY SEWER IMPROVEMENTS <br />1 2504.602 HYDRANT EACH 4 $5,600.00 22,400.00$ <br />2 2504.602 6" GATE VALVE AND BOX EACH 4 $1,500.00 6,000.00$ <br />3 2504.602 8" GATE VALVE AND BOX EACH 1 $2,500.00 2,500.00$ <br />4 2504.602 12" GATE VALVE AND BOX EACH 2 $5,600.00 11,200.00$ <br />5 2504.602 CONNECT TO EXISTING WATER MAIN EACH 1 $2,000.00 2,000.00$ <br />6 2504.602 CONNECT TO EXISTING WATER MAIN (SPEC)EACH 1 $1,000.00 1,000.00$ <br />7 2504.603 12" WATERMAIN DUCTILE IRON CL 52 LIN FT 1500 $72.00 108,000.00$ <br />8 2504.603 8" WATERMAIN DUCTILE IRON CL 52 LIN FT 500 $50.00 25,000.00$ <br />9 2504.603 6" WATERMAIN DUCTILE IRON CL 52 LIN FT 40 $50.00 2,000.00$ <br />10 2504.604 4" POLYSTYRENE INSULATION SQ YD 20 $45.00 900.00$ <br />11 2504.608 DUCTILE IRON FITTINGS POUND 1900 $7.50 14,250.00$ <br />3% CONTINGENCY 5,857.50$ <br />4% INDIRECT COSTS 7,148.30$ <br />SCHEDULE B - WATER MAIN IMPROVEMENTS SUB-TOTAL 208,255.80$ <br />B. WATER MAIN IMPROVEMENTS