Laserfiche WebLink
SCHWIETERs ADDITION <br />HUGO, MINNESOTA <br />J <br />� I <br />I <br />- I <br />------------------------- <br />--------------- <br />STREET N <br />-------------- <br />-------------- <br />EXISTING POND <br />,/%OUTLOT j / I <br />0 <br />SI / EXISTING WETLAND I <br />II II <br />I ) <br />I <br />I 11 <br />I I <br />I I <br />I I <br />I I <br />I <br />I <br />I I: <br />I <br />I <br />2 <br />O I <br />I <br />F1 <br />----J <br />-- - ------- <br />III <br />EXISTING BUILDING <br />1 <br />I I <br />I <br />I <br />I <br />I <br />140TH STREET N <br />/ I <br />I <br />I <br />I <br />I ' <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I I <br />II <br />I <br />I I <br />I <br />I <br />I � <br />I <br />I <br />I <br />I <br />'1 <br />'IA <br />I <br />--- <br />I I <br />I I <br />I <br />/ I <br />I <br />I I <br />I <br />I <br />I ' <br />VICINITY MAP <br />SITE <br />NOT TO SCALE <br />SHEET INDEX <br />C1. <br />COVER <br />C2. <br />PRELIMINARY PLAT (OVERALL) <br />C3. <br />EXISTING CONDITIONS (OVERALL) <br />C4. <br />EXISTING CONDITIONS (SITE) <br />C5. <br />REMOVALS PLAN <br />C6. <br />GRADING, DEVELOPMENT & <br />EROSION CONTROL PLAN <br />C7. <br />SITE & SIGN PLAN <br />C6. <br />UTILITY PLAN <br />C9. <br />140TH STREET PROFILE <br />C10-C11. <br />DETAILS <br />C12. <br />CAMPUS EXHIBIT <br />1-1-1-2. <br />LANDSCAPE PLAN <br />N <br />0 15 30 60 <br />( IN FEET ) <br />BENCHMARKS <br />1. Top Nut of Hydrant locoted approx. <br />120 ftnorthwesterly northwest comer <br />of the existing building, as shown_ <br />Elevation = 932,85 ft. <br />2. Top Nut of Hydrant located at the <br />southeast corner of 140th Street N. <br />and Fenwoy Boulevard N. <br />Elevation = 934,51 ft. <br />CALL BEFORE YOU DIG <br />Know what's below. <br />CaII before you dig. <br />Z� <br />O• 0 Lr. <br />yZM <br />,w <br />- CO) Z <br />I� Fa0 <br />VW� <br />o6,0 <br />mC) <br />V Woo0, <br />0, <br />rn <br />z t 0?w a QJ v <br />`QCO�� <br />15 M <br />W C <br />O <br />t <br />a <br />Z <br />O <br />M <br />% <br />IN <br />C <br />o <br />LU Q (1) <br />i I <br />0 <br />U F a, <br />LU <br />by = <br />x <br />U <br />U <br />J <br />J <br />!n <br />(� z <br />Z a, <br />~ C � <br />0 01 MO <br />J Q Ln <br />O I^ <br />x z <br />ZLLrn <br />Q rj 7 <br />J 2 <br />rn <br />lYrn <br />O <br />U` <br />REVISIONS g <br />1. 6/23/20 Issued For Permit m <br />2. 7/30/20 Per City Comment <br />3. 7/28/20 Addendum 2 E <br />4. 8/19/20 Per City Comment <br />5. <br />6. 6 <br />DRAWN BY. KRO <br />DESIGNED BY: WK <br />ISSUE DATE: 6/23/2020 <br />B <br />a <br />I hereby certify Nat this plan, specifca[ion o ret , was i- d by me or urMer my <br />direct upervision and that I a a tluly <br />Licensed Professional Engineer under the <br />laws of the State of Minnesota - <br />Y <br />Name: Brian J. KrystoBa,k', �P.E'. A <br />Signature: a 2 !S— <br />s <br />Date: 6/23/2020 License #: 25063 <br />C 1 of <br />Ll 2j <br />