My WebLink
|
Help
|
About
|
Sign Out
Home
2021 ANNUAL BUS TOUR
Hugo
>
Misc
>
Bus Tour Packets
>
2021 ANNUAL BUS TOUR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2021 11:59:36 AM
Creation date
10/11/2021 11:49:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ -- <br />-------------------------_,`., 140TH STRE T N <br />kk <br />I MAX FUT. IMPERVIOUS: 1.27 AC <br />I EXISTING <br />i I INFILTRATION <br />1 BASIN i� <br />/ / / ll PROPOSED OFFICE I �� <br />EXISTING I / OUTLOT A I + WAREHOUSE ¢ <br />I INFILTRATION I (22,580 S.F.) <br />\\ BASIN i FUTURE COLD A 11 <br />\ I j STORAGE 1 — <br />(37,420 S.F.) — <br />I EXISTING P P. IMPERVIOUS: 1. Aa <br />I EXISTING j WETLAND <br />I <br />RRETREAT Ew'I <br />\ II <br />I I I I J I <br />\I I I <br />I <br />------------- I II II u <br />�� � II II I I <br />---,r----- r --- <br />I II i ii iii I I <br />EXISTING OUTDOOR RAW —— — — — — — — — — <br />—I <br />MATERIALS STORAGE <br />I <br />I � <br />I <br />I --- I <br />2 <br />EXISTING <br />WETLANDS <br />/I <br />ll <br />I I <br />/ I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />EXISTING <br />PRETREATMENT <br />POND <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />II <br />II <br />II <br />II <br />I\ <br />I� I <br />I <br />I <br />I <br />I <br />I <br />I <br />EXISTING MANUFACTURING/ <br />WAREHOUSE BUILDING <br />(144,000 S.F.) <br />EXISTING OUTDOOR <br />FINISHED PRODUCT <br />STORAGE <br />229 SPACES <br />DVIDED ONLY <br />)UIRED BY CI' <br />i <br />I <br />I I <br />I <br />\140TH STREET N <br />I <br />_ <br />I <br />I <br />ll <br />III <br />II <br />I I <br />j <br />I <br />I <br />I <br />I I <br />I <br />II <br />IIIII <br />I <br />� <br />jcr <br />it <br />I \i <br />i I— <br />I I <br />it <br />I� <br />I I <br />I <br />� <br />i <br />I <br />i <br />I <br />I <br />�I <br />•I <br />I <br />I 0 <br />l <br />I Q <br />J <br />O <br />i m <br />3 <br />Z <br />W <br />L` <br />CAMPUS STORMWATER NOTES <br />1. LOT 1, BLOCK 1 ORIGINALLY DESIGNED FOR 1.17 ACRES OF <br />IMPERVIOUS SURFACES. CURRENT PROPOSED PLANS CONTAIN <br />APPROXIMATELY 1.39 ACRES OF NEW IMPERVIOUS SURFACES- <br />2 . THE FUTURE COLD STORAGE EXPANSION, AND ALL RELATED <br />FUTURE IMPERVIOUS, ORIGINALLY DESIGNED FOR 1.49 ACRES <br />OF IMPERVIOUS SURFACES, PROPOSED PLANS SHOW A <br />FUTURE LAYOUT MATH 1.27 ACRES OF IMPERVIOUS SURFACES. <br />3. TO ACCOMMODATE FOR THE INCREASE OF IMPERVIOUS FROM <br />LOT 1, THE FUTURE COLD STORAGE AND ALL RELATED <br />IMPERVIOUS LAYOUT HAS BEEN REVISED TO REDUCE THE <br />IMPERVIOUS SURFACE AREA. ULTIMATELY THE TOTAL CAMPUS <br />PERVIOUS SURFACE AREA WILL BE CONSISTENT NTH THE <br />ORIGINAL STORMWATER DESIGN. <br />IMPERVIOUS <br />SUMMARY <br />ORIGINAL DESIGN <br />PROPOSED <br />LOT 1 <br />1.17 AC. <br />1.39 AC. <br />FUT. COLD STORAGE <br />1.49 AC. <br />1.27 AC. <br />TOTAL <br />2.66 AC. <br />2.66 AC. <br />N <br />0 30 60 120 <br />(IN FEET) <br />BENCHMARKS <br />1, Top Nut of Hydrant located pp'— <br />120 ft. northwesterly northwest comer <br />of the existing building, as shown. <br />Elevation = 932.85 ft. <br />2. Top Nut of Hydrant located at the <br />southeast corner of 140th Street N. <br />and Fenway Boulevard N. <br />Elevation = 934.51 ft. <br />0 <br />In <br />G>W O1 0° <br />O• 0 N ILA M <br />��� <br />y ZO z <br />—CO) X <br />O <br />Z � C LL <br />VW�m� <br />V ^ <br />0 <br />0 <br />`QGO�� <br />M <br />w 0 <br />O <br />t <br />a <br />Z <br />0 <br />H �y <br />m o <br />_ 0 <br />Q <br />W c <br />W <br />a �m <br />cLLI7 <br />L FI = <br />Q 3 <br />U = <br />U <br />U <br />J <br />J <br />(� z <br />Z a, <br />~ C 00 <br />N O <br />J Q In <br />0 In <br />_ D z <br />0 C � <br />Z LL 01 <br />QL <br />J N 2 <br />rn <br />rn <br />H <br />U <br />5 <br />9 <br />REVISIONS g <br />1. 6/23/20 Issued For Permit m <br />t <br />2. 7/30/20 Per City Comment <br />3. 7/28/20 Addendum 2 E <br />4. 8/19/20 Per City Comment <br />5. - <br />6. 6 <br />DRAWN BY: KRO <br />DESIGNED BY: WK <br />ISSUE DATE: 6/23/2020 <br />B <br />a <br />I hereby certify that Nis plan, speci0"d" o r report was prepared by me or urMer my <br />direct supervision and that I a a tluly C <br />Licensed Professional Engineer under the <br />laws of the State of Minnesota - <br />Name: Brian J. KrystoHa,k', �P.E'. A <br />Signature: a 2 !S— <br />s <br />Date:6/23/2020 Ucense #: 25063 8 <br />LofC12 <br />Al2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.