Laserfiche WebLink
T� rL <br />1 1 2 3 4 5 6 7 ) 8 <br />/ II � LL 0I <br />GARA NEW ELEMENTARY <br />SAN SYMBOL LEGEND KEY NOTES DEMOLITION NOTES X , SCHOOL <br />I TOP=932.1 <br />INV= 913.5 • <br />6 i 6 I REMOVE AND DISPOSE OF O REMOVE AND DISPOSE OF BITUMINOUS PAVEMENT SECTION. 1. Verify all existing utility locations. ° <br />BITUMINOUS PAVEMENT SECTION 2. It is the responsibility of the Contractor to perform or coordinate all 15198 Forest Boulevard <br />7 3 O REMOVE AND DISPOSE OF CONCRETE PAVEMENT SECTION. p Y p <br />necessary utility demolitions and relocations from existing utility locations _ — — — — — — — Hugo, Minnesota 55038 <br />L <br />. REMOVE AND DISPOSE OF CLEAR AND GRUB ALL TREES, BRUSH, STUMPS, ETC. VERIFY to all onsite amenities and buildings. These connections include, but are <br />'.r ,.- . •- ' O TREE LOCATION SIZE AND TYPE BEFORE REMOVAL. not limited to, water, sanitary sewer, cable tv, telephone, gas, electric, site <br />.ti . �• CONCRETE PAVEMENT SECTION <br />lighting, etc. <br />4 •• REMOVE AND DISPOSE OF FENCE INCLUDING ALL FABRIC, ' <br />A OE OE OE OE OE APPROXIMATE SOIL BORING LOCATION O POSTS, GATES, MOWSTRIPS, AND FOOTINGS. 3. Prior to beginning work, contact Gopher State Onecall (651-454-0002) to 30 10 10 30 — 30 <br />locate utilities throughout the area under construction. The Contractor 110 30 0 —30 10 INDEPENDENT SCHOOL <br />REMOVE AND DISPOSE OF BUILDING AND ANY RELATED shall retain the services of a private utility locator to locate the private <br />- �0 — �0 �O4 30 8 O INFRASTRUCTURE ITEMS INCLUDING ALL UTILITY SERVICES. utilities. SEE SHEET C500 DISTRICT #624 <br />8 k O 0 TREE REMOVAL NIIIIIIIIIIIIIIII <br />OREMOVE AND DISPOSE OF CONCRETE CURB AND GUTTER. 4. Sawcut along edges of pavements, sidewalks, and curbs to remain. 4855 Bloom Ave <br />GAS GAS GAS GAS GAS GAS GAS .GAS GA' <br />O REMOVE AND DISPOSE OF SANITARY SEWER PIPE. 5. All construction shall be performed in accordance with state and local White Bear Lake, Minnesota 55110 <br />,S GA GAS GAS GAS k —GAS GAS GA. standard specifications for construction. r, <br />10 10 110 30 30 <br />30 130 10 14110 30 CLEAR AND GRUB LIMITS O PROTECT EXISTING POWER POLE, UTILITIES, TREES, ETC. <br />8 8 <br />OE OE OE OE OE OE OE OE OE OE — OE OE OE OE OE — OE OE OE OE OE OE 0 OE -, <br />OE — OE OE OE OE OE OE OE OE OE OE OE OE- OE OE OE OE OE OE OE OE OE <br />8 <br />8 8 <br />8iD <br />8 ' <br />I <br />1 t 3 <br />x <br />4 k <br />k I <br />X <br />B <br />k <br />WOLD ARCHITECTS <br />0 AND ENGINEERS <br />>C 332 Minnesota Street, Suite W2000 <br />Saint Paul, MN 55101 <br />>C >C woldae.com 1 651 227 7773 <br />k I k <br />x x KRAUS-ANDERSON® <br />I 501 South Eighth Street <br />>C k Minneapolis, MN 55404 <br />krausanderson.com 1 612 332 7281 <br />Larson <br />x x Engineering, Inc. <br />3524 Labore Road <br />/ White Bear Lake, MN 55110 <br />X k 4 <br />651.481.9120 (f) 651.481.9201 <br />www.larsonengr.com <br />k <br />© 2020 Larson Engineering, Inc. All rights reserved. <br />X k <br />X k <br />x k <br />1 <br />x k <br />1 <br />D <br />�c o x / <br />4 0 <br />B-1 <br />!' x <br />X B-4 0 / <br />k <br />x <br />3 / NORTH <br />0 1 k <br />_ o � <br />0 -0-AB-1 0 15 30 60 <br />O <br />\ o <br />I hereby certify that this plan, specifications or report ° <br />O was prepared by me or under my direct supervision <br />k / and that I am a duly licensed Professional Engineer <br />under <br />rtthelaws of the state of Minnesota. <br />�C Matt Woodruff, P.E. <br />\ ° <br />0 Date: 11.20.2020 Lic. No.: 41885 <br />G� <br />k � <br />E � O x O <br />\ ° <br />(7) <br />\ ° O k <br />O <br />IO 3 <br />X O <br />Revisions <br />Description <br />Date <br />Num <br />Addendum #2 <br />December 10, 2020 <br />1 <br />Pond Revisions <br />January 15, 2021 <br />2 <br />City Submittal <br />February 5, 2021 <br />I ° <br />Comm: 12196195 <br />Date: 11.20.2020 <br />o x <br />I 0 ' Drawn: KBK <br />k G) Check: MJW North <br />O <br />/ I � <br />O x DEMOLITION <br />PLAN - NORTH <br />° MATCHLINE - C100 >C <br />MATCHLINE - C101 <br />F <br />O �C l I <br />< <br />1 <br />Scale: Per Plan <br />O <br />x <br />I OC1 00 <br />x � <br />' 1 1 1 1 1 1 1 r <br />