My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 032521
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2021 PC Packets
>
PC PACKET 032521
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2021 9:45:06 AM
Creation date
10/25/2021 8:54:32 AM
Metadata
Fields
Template:
Commissions
Meeting Date
3/25/2021
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />NEW ELEMENTARY <br />SCHOOL <br />15198 Forest Boulevard <br />Hugo, Minnesota 55038 <br />MN <br />A <br />NEW ELEMENTARY SCHOOL <br />INDEPENDENT SCHOOL DISTRICT #624: WHITE BEAR LAKE AREA SCHOOLS <br />HUGO, MN <br />B <br />C <br />SURVEY - FOR INFORMATIONAL PURPOSES ONLY <br />CIVIL <br />ARCHITECTURAL <br />ARCHITECTURAL <br />STRUCTURAL <br />MECHANICAL <br />ELECTRICAL <br />C100 DEMOLITION PLAN - NORTH <br />A0.001 <br />CODE ANALYSIS <br />A4.711 <br />DETAILS - INTERIOR CASEWORK SECTIONS <br />S0.000 <br />STRUCTURAL TITLE SHEET <br />M0.000 <br />MECHANICAL TITLE SHEET <br />E0.00 <br />ELECTRICAL SYMBOLS AND ABBREVIATIONS <br />C101 DEMOLITION PLAN - SOUTH <br />A0.101 <br />CODE PLAN - MAIN LEVEL <br />A4.712 <br />DETAILS - INTERIOR CASEWORK SECTIONS <br />S2.01a <br />FOOTING AND FOUNDATION PLAN - AREA A <br />M1.00a <br />UNDERFLOOR PLUMBING PLAN - AREA'A' <br />E0.01 <br />ELECTRICAL SITE PLAN <br />C200 PAVING PLAN - NORTH <br />A0.102 <br />CODE PLAN - UPPER LEVEL <br />A4.801 <br />DETAILS - INTERIOR OPENING DETAILS <br />S2.01b <br />FOOTING AND FOUNDATION PLAN - AREA B <br />M1.00b <br />UNDERFLOOR PLUMBING PLAN - AREA'B' <br />E0.02 <br />ELECTRICAL OVERALL PLAN <br />C201 PAVING PLAN - SOUTH <br />A0.103 <br />CODE PLAN - STORM SHELTER <br />A4.802 <br />DETAILS - INTERIOR OPENING DETAILS <br />S2.01c <br />FOOTING AND FOUNDATION PLAN - AREA C <br />M1.00C <br />UNDERFLOOR PLUMBING PLAN - AREA'C' <br />E0.03 <br />ELECTRICAL OVERALL PLAN <br />C300 GRADING AND EROSION CONTROL PLAN - NORTH <br />A2.01a <br />MAIN LEVEL FLOOR PLAN - AREA'A' <br />A4.901 <br />DETAILS - INTERIOR CEILING DETAILS <br />S2.01d <br />FOOTING AND FOUNDATION PLAN - AREA D <br />M1.00d <br />UNDERFLOOR PLUMBING PLAN - AREA'D' <br />E1.10 <br />ELECTRICAL LIGHTING PLAN MAIN LEVEL - AREA A <br />B <br />C301 GRADING AND EROSION CONTROL PLAN - SOUTH <br />A2.01 b <br />MAIN LEVEL FLOOR PLAN - AREA'B' <br />A5.101 <br />EXTERIOR ELEVATIONS <br />S2.01e <br />FOOTING AND FOUNDATION PLAN - AREA E <br />M1.00e <br />UNDERFLOOR PLUMBING PLAN - AREA'E' <br />E1.11 <br />ELECTRICAL LIGHTING PLAN MAIN LEVEL - AREA B <br />C400 UTILITY PLAN - NORTH <br />A2.01c <br />MAIN LEVEL FLOOR PLAN - AREA'C' <br />A5.102 <br />EXTERIOR ELEVATIONS <br />S2.02a <br />UPPER LEVEL AND LOW ROOF FRAMIING PLAN - AREA A <br />M1.01a <br />MAIN LEVEL PLUMBING PLAN - AREA'A' <br />E1.12 <br />ELECTRICAL LIGHTING PLAN MAIN LEVEL - AREA C <br />C401 UTILITY PLAN - SOUTH <br />A2.01 d <br />MAIN LEVEL FLOOR PLAN - AREA'D' <br />A5.103 <br />EXTERIOR ELEVATIONS <br />S2.02b <br />UPPER LEVEL AND LOW ROOF FRAMIING PLAN - AREA B <br />M1.01 b <br />MAIN LEVEL PLUMBING PLAN - AREA'B' <br />E1.13 <br />ELECTRICAL LIGHTING PLAN MAIN LEVEL - AREA D <br />C500 FOXHILL AVE UTILITY CONNECTION <br />A2.01e <br />MAIN LEVEL FLOOR PLAN - AREA'E' <br />A5.104 <br />EXTERIOR ELEVATIONS <br />S2.02c <br />UPPER LEVEL FRAMING PLAN - AREA C <br />M1.01c <br />MAIN LEVEL PLUMBING PLAN - AREA'C' <br />E1.14 <br />ELECTRICAL LIGHTING PLAN MAIN LEVEL - AREA E <br />C600 DETAILS <br />A2.02a <br />UPPER LEVEL FLOOR PLAN - AREA'A' AND PENTHOUSE PLAN - <br />A5.105 <br />EXTERIOR WALL PATTERNS <br />S2.02d <br />UPPER LEVEL FRAMING PLAN - AREA D <br />M1.01d <br />MAIN LEVEL PLUMBING PLAN - AREA'D' <br />E1.20 <br />ELECTRICAL LIGHTING PLAN UPPER LEVEL - AREA A <br />C601 DETAILS <br />AREA'B' <br />A5.200 <br />EXTERIOR WALL TYPES <br />S2.02e <br />UPPER LEVEL FRAMING PLAN - AREA E <br />M1.01e <br />MAIN LEVEL PLUMBING PLAN - AREA'E' <br />E1.21 <br />ELECTRICAL LIGHTING PLAN UPPER LEVEL - AREA B <br />C602 DETAILS <br />A2.02b <br />UPPER LEVEL FLOOR PLAN - AREA'B' <br />A5.201 <br />WALL SECTIONS <br />S2.03a <br />ROOF FRAMING PLAN -AREA A <br />M1.02a <br />UPPER LEVEL PLUMBING PLAN - AREA'A' <br />E1.22 <br />ELECTRICAL LIGHTING PLAN UPPER LEVEL - AREA C <br />C603 DETAILS <br />A2.02c <br />UPPER LEVEL FLOOR PLAN - AREA'C' <br />A5.202 <br />WALL SECTIONS <br />S2.03b <br />ROOF FRAMING PLAN - AREA B <br />M1.02b <br />UPPER LEVEL PLUMBING PLAN - AREA'B' <br />E1.23 <br />ELECTRICAL LIGHTING PLAN UPPER LEVEL - AREA D <br />L1.001 LANDSCAPE LAYOUT PLAN NW QUADRANT <br />A2.02d <br />UPPER LEVEL FLOOR PLAN - AREA'D' <br />A5.203 <br />WALL SECTIONS <br />S2.03c <br />ROOF FRAMING PLAN - AREA C <br />M1.02c <br />UPPER LEVEL PLUMBING PLAN - AREA'C' <br />E1.24 <br />ELECTRICAL LIGHTING PLAN UPPER LEVEL - AREA E <br />L1.002 LANDSCAPE LAYOUT PLAN NE QUADRANT <br />A2.02e <br />UPPER LEVEL FLOOR PLAN - AREA'E' <br />A5.204 <br />WALL SECTIONS <br />S2.03d <br />ROOF FRAMING PLAN - AREA D <br />M1.02d <br />UPPER LEVEL PLUMBING PLAN - AREA'D' <br />E1.25 <br />ELECTRICAL LIGHTING PLAN - PENTHOUSE <br />L1.003 LANDSCAPE LAYOUT PLAN SW QUADRANT <br />A2.095 <br />ROOF PLAN <br />A5.205 <br />WALL SECTIONS <br />S2.03e <br />ROOF FRAMING PLAN - AREA E <br />M1.02e <br />UPPER LEVEL PLUMBING PLAN - AREA'E' <br />E2.10 <br />ELECTRICAL POWER PLAN MAIN LEVEL - AREA A <br />L1.004 LANDSCAPE LAYOUT PLAN SE QUADRANT <br />A2.901 <br />DOOR / FRAME / WINDOW / LOUVER TYPES <br />A5.206 <br />WALL SECTIONS <br />S2.04b <br />HIGH ROOF FRAMING PLAN - AREA B <br />M2.01a <br />MAIN LEVEL HYDRONIC PLAN - AREA'A' <br />E2.11 <br />ELECTRICAL POWER PLAN MAIN LEVEL - AREA B <br />L1.005 LANDSCAPE LAYOUT PLAN N QUADRANT <br />A2.902 <br />STOREFRONT/ CURTAINWALL TYPES <br />A5.207 <br />WALL SECTIONS <br />S3.001 <br />STORM SHELTER WIND LOADS <br />M2.01 b <br />MAIN LEVEL HYDRONIC PLAN - AREA'B' <br />E2.12 <br />ELECTRICAL POWER PLAN MAIN LEVEL - AREA C <br />L1.006 OVERALL IRRIGATION LAYOUT PLAN <br />A2.903 <br />CURTAINWALL TYPES <br />A5.208 <br />WALL SECTIONS <br />S3.002 <br />STORM SHELTER WIND LOADS <br />M2.01c <br />MAIN LEVEL HYDRONIC PLAN - AREA'C' <br />E2.13 <br />ELECTRICAL POWER PLAN MAIN LEVEL - AREA D <br />F L1.007 LANDSCAPE DETAILS, NOTES, AND SCHEDULES <br />A2.911 <br />ROOM FINISH SCHEDULES - MAIN LEVEL <br />A5.501 <br />DETAILS - EXTERIOR WALL <br />S5.201 <br />SECTIONS AND DETAILS <br />M2.01d <br />MAIN LEVEL HYDRONIC PLAN - AREA'D' <br />E2.14 <br />ELECTRICAL POWER PLAN MAIN LEVEL - AREA E <br />L1.008 LANDSCAPE DETAILS, NOTES, AND SCHEDULES <br />A2.912 <br />ROOM FINISH SCHEDULES - UPPER LEVEL <br />A5.502 <br />DETAILS - EXTERIOR WALL <br />S5.211 <br />SECTIONS AND DETAILS <br />M2.01e <br />MAIN LEVEL HYDRONIC PLAN - AREA'E' <br />E2.20 <br />ELECTRICAL POWER PLAN UPPER LEVEL - AREA A <br />L1.009 LANDSCAPE DETAILS, NOTES, AND SCHEDULES <br />A3.01a <br />MAIN LEVEL REFLECTED CEILING PLAN - AREA'A' <br />A5.503 <br />DETAILS - EXTERIOR WALL <br />S5.221 <br />SECTIONS AND DETAILS <br />M2.02a <br />UPPER LEVEL HYDRONIC PLAN - AREA'A' <br />E2.21 <br />ELECTRICAL POWER PLAN UPPER LEVEL - AREA B <br />L1.010 LANDSCAPE DETAILS, NOTES, AND SCHEDULES <br />A3.01 b <br />MAIN LEVEL REFLECTED CEILING PLAN - AREA'B' <br />A5.504 <br />DETAILS - EXTERIOR WALL <br />S5.222 <br />SECTIONS AND DETAILS <br />M2.02b <br />UPPER LEVEL HYDRONIC PLAN - AREA'B' <br />E2.22 <br />ELECTRICAL POWER PLAN UPPER LEVEL - AREA C <br />A3.01c <br />MAIN LEVEL REFLECTED CEILING PLAN - AREA'C' <br />A5.601 <br />DETAILS - EXTERIOR OPENINGS <br />0 S5.223 <br />SECTIONS AND DETAILS <br />M2.02c <br />UPPER LEVEL HYDRONIC PLAN - AREA'C' <br />E2.23 <br />ELECTRICAL POWER PLAN UPPER LEVEL - AREA D <br />A3.01d <br />MAIN LEVEL REFLECTED CEILING PLAN - AREA'D' <br />A5.602 <br />DETAILS - EXTERIOR OPENINGS <br />S5.301 <br />BRACED FRAME ELEVATIONS <br />M2.02d <br />UPPER LEVEL HYDRONIC PLAN - AREA'D' <br />E2.24 <br />ELECTRICAL POWER PLAN UPPER LEVEL - AREA E <br />A3.01e <br />MAIN LEVEL REFLECTED CEILING PLAN - AREA'E' <br />A5.603 <br />DETAILS - EXTERIOR OPENINGS <br />S5.302 <br />BRACED FRAME ELEVATIONS <br />M2.02e <br />UPPER LEVEL HYDRONIC PLAN - AREA'E' <br />E2.25 <br />ELECTRICAL POWER PLAN PENTHOUSE <br />w <br />A3.02a <br />UPPER LEVEL REFLECTED CEILING PLAN - AREA'A' <br />A5.604 <br />DETAILS - EXTERIOR OPENINGS <br />S5.303 <br />BRACED FRAME ELEVATIONS AND DETAILS <br />M3.01a <br />MAIN LEVEL VENTILATION PLAN - AREA'A' <br />E2.26 <br />ELECTRICAL POWER PLAN - ROOF <br />A3.02b <br />UPPER LEVEL REFLECTED CEILING PLAN - AREA'B' <br />A5.701 <br />DETAILS - EXTERIOR ROOF <br />S6.201 <br />SCHEDULES AND DETAILS <br />M3.01 b <br />MAIN LEVEL VENTILATION PLAN - AREA'B' <br />E3.10 <br />ELECTRICAL TECHNOLOGY PLAN MAIN LEVEL - AREA A <br />= <br />A3.02c <br />UPPER LEVEL REFLECTED CEILING PLAN - AREA'C' <br />A5.702 <br />DETAILS - EXTERIOR ROOF <br />M3.01c <br />MAIN LEVEL VENTILATION PLAN - AREA'C' <br />E3.11 <br />ELECTRICAL TECHNOLOGY PLAN MAIN LEVEL - AREA B <br />A3.02d <br />UPPER LEVEL REFLECTED CEILING PLAN - AREA'D' <br />A6.101 <br />DETAILS - SITE <br />M3.01d <br />MAIN LEVEL VENTILATION PLAN - AREA'D' <br />E3.12 <br />ELECTRICAL TECHNOLOGY PLAN MAIN LEVEL - AREA C <br />A3.02e <br />UPPER LEVEL REFLECTED CEILING PLAN - AREA'E' <br />A6.102 <br />DETAILS - SITE <br />M3.01e <br />MAIN LEVEL VENTILATION PLAN - AREA'E' <br />E3.13 <br />ELECTRICAL TECHNOLOGY PLAN MAIN LEVEL - AREA D <br />A3.030 <br />REFLECTED CEILING PLAN DIMENSIONS <br />M3.02a <br />UPPER LEVEL VENTILATION PLAN - AREA'A' <br />E3.14 <br />ELECTRICAL TECHNOLOGY PLAN MAIN LEVEL - AREA E <br />A4.101 <br />DETAILS - GENERAL - SYMBOLS, ABBREVIATIONS, MATERIAL <br />M3.02b <br />UPPER LEVEL VENTILATION PLAN - AREA'B' <br />E3.20 <br />ELECTRICAL TECHNOLOGY PLAN UPPER LEVEL -AREA A <br />FINISH SCHEDULE <br />M3.02c <br />UPPER LEVEL VENTILATION PLAN - AREA'C' <br />E3.21 <br />ELECTRICAL TECHNOLOGY PLAN UPPER LEVEL - AREA B <br />gG <br />A4.102 <br />DETAILS -GENERAL -MOUNTING HEIGHTS <br />M3.02d <br />UPPER LEVEL VENTILATION PLAN - AREA'D' <br />E3.22 <br />ELECTRICAL TECHNOLOGY PLAN UPPER LEVEL - AREA C <br />v <br />a <br />A4.103 <br />ENLARGED TOILET PLANS <br />M3.02e <br />UPPER LEVEL VENTILATION PLAN - AREA'E <br />E3.23 <br />ELECTRICAL TECHNOLOGY PLAN UPPER LEVEL - AREA D <br />tF <br />3 o <br />A4.201 <br />ENLARGED VERTICAL CIRCULATION PLANS AND SECTIONS <br />M4.001 <br />MAIN LEVEL FIRE PROTECTION PLAN <br />E3.24 <br />ELECTRICAL TECHNOLOGY PLAN UPPER LEVEL - AREA E <br />w <br />A4.202 <br />ENLARGED VERTICAL CIRULATION AND SECTIONS <br />M4.002 <br />UPPER LEVEL FIRE PROTECTION PLAN <br />E4.0 <br />ENLARGED KITCHEN PLAN <br />A4.203 <br />ENLARGED VERTICAL CIRCULATION, SECTIONS AND DETAILS <br />M5.001 <br />MECHANICAL ROOF PLAN <br />E5.0 <br />ELECTRICAL LIGHTING SCHEDULE <br />A4.204 <br />DETAILS - VERTICAL CIRCULATION <br />FOOD <br />SERVICE <br />M5.002 <br />PLUMBING ROOF PLAN <br />E5.1 <br />ELECTRICAL LIGHTING DETAILS <br />A4.205 <br />DETAILS - VERTICAL CIRCULATION <br />M6.001 <br />SOUTH PENTHOUSE VENTILATION PLANS <br />E6.0 <br />ELECTRICAL POWER RISER DIAGRAM <br />A4.301 <br />MAIN LEVEL FLOOR FINISH PLAN - AREA'A' <br />M6.002 <br />NORTH PENTHOUSE VENTILATION PLANS <br />E6.1 <br />PANELBOARDS, DISTRIBUTION SCHEDULES AND DETAILS <br />A4.302 <br />MAIN AND UPPER LEVEL FLOOR FINISH PLANS - AREA'B' <br />QF101 <br />FOODSERVICE EQUIPMENT PLAN <br />M6.003 <br />ENLARGED HYDRONIC PLANS <br />E6.2 <br />PANELBOARDS, DISTRIBUTION SCHEDULES AND DETAILS <br />A4.303 <br />MAIN AND UPPER LEVEL FLOOR FINISH PLANS - AREA'C' <br />QF111 <br />FOODSERVICE PLUMBING CONNECT PLAN <br />M6.004 <br />PENTHOUSE PLUMBING PLANS <br />E6.3 <br />BUILDING EQUIPMENT SCHEDULE <br />A4.304 <br />MAIN AND UPPER LEVEL FLOOR FINISH PLANS - AREA'D' <br />QF121 <br />FOODSERVICE ELECTRICAL CONNECT PLAN <br />M6.005 <br />ENLARGED KITCHEN PLUMBING PLANS <br />E6.4 <br />ELECTRICAL MECHANICAL EQUIPMENT SCHEDULE <br />A4.305 <br />MAIN AND UPPER LEVEL FLOOR FINISH PLANS - AREA'E' <br />QF131 <br />FOODSERVICE SPECIAL CONDITIONS PLAN <br />M6.006 <br />ENLARGED BOILER ROOM PLUMBING PLANS <br />E6.5 <br />KITCHEN DETAILS AND SCHEDULE <br />A4.306 <br />GYMNASIUM STRIPING PLAN <br />QF201 <br />FOODSERVICE EQUIPMENT ELEVATIONS <br />M6.007 <br />ENLARGED TOILET ROOM PLUMBING PLANS <br />E7.0 <br />ELECTRICAL DETAILS <br />A4.401 <br />CASEWORK ELEVATIONS <br />QF501 <br />FOODSERVICE DETAILS <br />M7.001 <br />DOMESTIC RISER DIAGRAM <br />E8.0 <br />TECHNOLOGY DETAILS <br />A4.402 <br />CASEWORK ELEVATIONS <br />QF901 <br />FOODSERVICE EQUIPMENT ISOMETRICS <br />M7.002 <br />WASTE & VENT RISER DIAGRAM <br />E8.1 <br />TECHNOLOGY DETAILS <br />" <br />A4.403 <br />INTERIOR ELEVATIONS <br />M7.003 <br />HYDRONIC RISER DIAGRAMS <br />A4.404 <br />INTERIOR ELEVATIONS <br />M8.000 <br />MECHANICAL SCHEDULES <br />A4.405 <br />INTERIOR ELEVATIONS <br />M8.001 <br />MECHANICAL SCHEDULES <br />A4.406 <br />INTERIOR ELEVATIONS <br />M9.000 <br />MECHANICAL DETAILS <br />A4.701 <br />DETAILS - WALL TYPES <br />M9.001 <br />MECHANICAL DETAILS <br />A4.706 <br />DETAILS - INTERIOR WALL DETAILS <br />M9.002 <br />MECHANICAL DETAILS <br />A4.707 <br />DETAILS - INTERIOR WALL DETAILS <br />A4.710 <br />DETAILS - INTERIOR CASEWORK SECTIONS <br />INDEPENDENT SCHOOL <br />DISTRICT #624 <br />4855 Bloom Ave <br />White Bear Lake, Minnesota 55110 <br />WOLD ARCHITECTS <br />AND ENGINEERS <br />332 Minnesota Street, Suite W2000 <br />Saint Paul, MN 55101 <br />woldae.com 1 651 227 7773 <br />f11IAUJ-A� V LJ Ll\JIJ!Y <br />501 South Eighth Street <br />Minneapolis, MN 55404 <br />krausanderson.com 1 612 332 7281 <br />B KB M <br />ENGINEERS <br />Ill <br />HALLBERG ENGINEERING <br />Mechanical / Electrical / Commissioning/ Energy <br />Larson <br />Engineering <br />0 <br />7- <br />1! <br />LJG UESIGN, LLC <br />F40O0SEFZVICE FACILITIES <br />CONSULTING & 1DE514GN <br />Set No: <br />Comm No: 192237 <br />
The URL can be used to link to this page
Your browser does not support the video tag.