My WebLink
|
Help
|
About
|
Sign Out
Home
2022.01.03 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2022 CC Packets
>
2022.01.03 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2021 3:14:23 PM
Creation date
12/30/2021 3:08:24 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
1/3/2022
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Rachel Juba <br />December 16, 2021 <br />Page 2 <br />4. Water service to the site will be achieved with extending the existing 12” watermain stub <br />within 140th Street from the existing western addition limits to approximately 550’ further west. <br />An existing hydrant stubbed from the south is providing additional fire protection. <br />5. Sanitary sewer service is available to the site from the existing 6” sanitary sewer service stub <br />from the manhole located in the future 140th Street to the north that was installed with the <br />original overall Schwieters site. <br />6. Two rows of parking (27 spaces) are provided along and across from the northern side of the <br />building along future 140th Street. Additional industrial loading areas are available on the <br />west and south sides of the building. <br />7. Detailed redline comments have been provided on the plans and sent to the applicants <br />engineer so they can be addressed in future submittals. <br /> <br />Stormwater Management <br /> <br />8. The expansion of this site was planned for with the stormwater management filtration basin <br />constructed as part of the original Schwieters site. Rate control and water quality <br />requirements for the expansion are anticipated to be met through this filtration basin. The <br />previously approved HydroCAD model will need to be updated to be representative of the <br />proposed changes to what was previously approved. <br />9. The stormwater requirements for the extension of 140th Street will be addressed with the City <br />Project and be accommodated by expanding existing stormwater management facilities on <br />either the north or south side of 140th Street which are located on City property. <br />10. Drainage and Utility Easements will need to be provided over the existing 6” PE drain tile <br />outlet for the existing stormwater management facilities for the overall site. <br />11. A stormwater agreement between the two sites will be required as private storm sewer <br />extends between the two parcels. <br />12. Stormwater plan and model comments have been provided to applicant and will need to be <br />addressed in future submittals for documentation and permitting purposes. <br /> <br />Wetland <br /> <br />13. There are no wetland impacts associated with the proposed improvements. <br /> <br />Thank you for the opportunity to provide comments on this project. Additional comments may be <br />necessary following the review of the responses to these. If you have any questions, please do <br />not hesitate to contact me at 651-286-8463. <br /> <br />Sincerely, <br /> <br />WSB <br /> <br /> <br /> <br />Mark Erichson, PE <br />City Engineer <br /> <br />cc: Scott Anderson, Public Works Director (email only) <br /> Liz Finnegan, Senior Engineering Technician (email only)
The URL can be used to link to this page
Your browser does not support the video tag.