My WebLink
|
Help
|
About
|
Sign Out
Home
Parks Packet 06.17.20
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2020
>
Parks Packet 06.17.20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 3:37:54 PM
Creation date
1/3/2022 3:34:30 PM
Metadata
Fields
Template:
Commissions
Meeting Date
6/17/2020
Document Type
Agenda/Packets
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />it CITY C)F <br />EST. 1906 <br />31It <br />-- a- <br />FUTURE ROAD & TRAIL CONNECTION (140TH ST.) <br />dhME <br />EXISTING <br />TRAIL <br />ACCESS <br />EXISTING / '• <br />PARKING & <br />1 ACCESS <br />1 <br />i T i1 l4 <br />PLAN <br />0' 100' 200' 400' <br />Scale in Feet <br />c1earwater eel? <br />Preferred Concept P rin <br />LEGEND <br />Pedestrian Trail (aggregate or paved) <br />Boardwalk <br />Overlook <br />Winter Trail • • <br />• • • <br />•� <br />Waterway <br />Bridge <br />Existing City Trail <br />Proposed Trail <br />Access Point <br />X -, wAmj�r. PARKING LOT/ <br />TRAILHEAD <br />FUTURE <br />STORMWATER POND <br />POTENTIAL FUTURE <br />EXPANSION AREA <br />+ 16 <br />ft <br />ItIQ <br />` " SUMMARY NOTES: <br />a = _!' • Park entrance off of future 140th Street Extension <br />-Parking lot <br />-Park & trail map (trailhead) <br />-Open space <br />;tc-n -' -Small picnic shelter <br />•Main park entrance off Fable Hill Circle North <br />• remains <br />YN - <br />' - -Parking (existing) <br />-Park and trail map (trailhead) <br />�; • Trail connection to Fenwav Blvd trail <br />•'i. =F ill • <br />Several loop trails /boardwalk system east and <br />west sides of creek with trail maps <br />• Several seating / overlooks along trails <br />• Pedestrian bridge on north and south end of the <br />park to cross the creek <br />• West trail to connect to future residential <br />development and trail north of 140th Street <br />• Park trails connect to future trail along 140th Street <br />• Existing policies regarding dogs, horses, & hunting <br />remain unless conflicts arise <br />x-� err{ <br />BRIDGE <br />WINTER TRAIL <br />SIMPLE BOARDWALK <br />r . .k 1L <br />OVERLOOK <br />STRUCTURAL BOARDWALK <br />1 <br />MIA <br />ra <br />WSB <br />PV <br />011947-000 1 September 19, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.