My WebLink
|
Help
|
About
|
Sign Out
Home
Parks Packet 08.19.20
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2020
>
Parks Packet 08.19.20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 3:41:07 PM
Creation date
1/3/2022 3:38:20 PM
Metadata
Fields
Template:
Commissions
Meeting Date
8/19/2020
Document Type
Agenda/Packets
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Shayla Denaway <br />August 14, 2020 <br />Page 4 <br />vii. Parks Commission Meeting: WSB and the Architect shall attend a virtual Parks <br />Commission Meeting to present the final multipurpose pavilion and estimate, <br />along with the overall site plan and estimate, for review and approval. <br />viii. City Council Meeting: WSB and the Architect shall attend a virtual City Council <br />Meeting to present the final multipurpose pavilion design and estimate, along <br />with the overall site plan and estimate, for review and approval to carry the <br />preferred approach into the final design package for construction. <br />SCOPE OF SERVICES "C" (Topographical Survey) <br />C.1. Site Topographical Survey: <br />i. WSB will prepare a site topographic survey illustrating existing site development <br />and elevations. This will provide the team with a higher level of detail necessary <br />for final design. Note: a boundary/property line survey is not included. Gopher <br />State One -Call will identify any public utilities, but private utilities must be located <br />by the City. <br />ADDITIONAL SERVICES <br />Services other than those listed in the Scope of Services above and requested and authorized in <br />writing by the City. These services shall be billed on an hourly basis according to the current <br />Hourly Rate Schedule at time of request. <br />FEES FOR PROFESSIONAL SERVICES <br />It is proposed that the following Tasks be billed on an hourly -not -to -exceed basis according to the <br />following breakdowns: <br />Scope "A" (Playground): $30,000 <br />Scope "B" (Multipurpose Pavilion): $20,000 <br />Scope "C" (Topo Survey): $ 7,000 <br />Total: $57,000 <br />Thank you for the opportunity to propose on this project. If you should have any questions <br />regarding this proposal, please contact me at 763-231-4848. <br />Sincerely, <br />WSB & Associates. Inc. <br />Candace Amberg, PLA <br />Project Manager <br />WSB & Associates, Inc. <br />Jason L. Amberg, PLA <br />Director of Landscape Architecture <br />GAGroup Data\Municipal\Clients - Cities - Counties\Hugo\Proposals\2020 Lions Park\PROP_2020 Lions Park Playground Bldg DD.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.