Laserfiche WebLink
E <br />146th Parking* <br />E1 <br />Earthwork <br />1 <br />LS <br />$20,000 <br />$20,000 <br />$30,000 <br />$30,000 <br />E2 <br />Bituminous Pavement <br />1,100 <br />SY <br />$28 <br />$30,800 <br />$40 <br />$44,000 <br />E3 <br />Curb & Gutter <br />550 <br />1 LF <br />$20 <br />$11,000 <br />$25 <br />$13,750 <br />E4 <br />Striping & Signage <br />1 <br />LS <br />$2,000 <br />$2,000 <br />$3,000 <br />$3,000 <br />SUBTOTAL: <br />$63,800 <br />$90, 750 <br />F <br />Memorial Area <br />F1 <br />Concrete Pavement <br />4,000 <br />SF <br />$10 <br />$40,000 <br />$20 <br />$80,000 <br />F2 <br />Flagpoles <br />5 <br />EA <br />$8,000 <br />$40,000 <br />$10,000 <br />$50,000 <br />F3 <br />Memorials (budget) <br />1 <br />LS <br />$50,000 <br />$50,000 <br />$150,000 <br />$150,000 <br />F4 <br />jBenches <br />3 <br />1 EA <br />1 $2,5001 <br />$7,5001 <br />$3,0001 <br />$9,000 <br />F5 <br />Landscaping (budget) <br />1 <br />LS <br />$5,000 <br />$5,000 <br />$10,000 <br />$10,000 <br />SUBTOTAL: <br />1 <br />1 $142,5001 <br />$299,000 <br />ESTIMATE SUBTOTAL: <br />$547,350 <br />$1,103,750 <br />Recommended Contingency (15%) <br />$82,103 <br />$165,563 <br />Estimated Professional Design, Engineering & Permit Fees (20%) <br />$109,470 <br />$220,750 <br />ESTIMATED PROJECT TOTAL: <br />1 $738,923 <br />1 $1,490,063 <br />*Stormwater work is assumed to be under the costs for street construction and is therefore not included in this estimate <br />K:\016030-000\Quantity\Preliminary\016030_Feasibility Est_2020-0710 Page 3 of 3 <br />