My WebLink
|
Help
|
About
|
Sign Out
Home
Parks Packet 08.19.20
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2020
>
Parks Packet 08.19.20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 3:41:07 PM
Creation date
1/3/2022 3:38:20 PM
Metadata
Fields
Template:
Commissions
Meeting Date
8/19/2020
Document Type
Agenda/Packets
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />0 <br />U <br />0. <br />Z <br />W <br />CO <br />W <br />0 <br />0 <br />00 <br />m <br />Z <br />�i <br />J <br />0 <br />a <br />a <br />W <br />Z <br />Z <br />2 <br />0 <br />0 <br />CO <br />W <br />W <br />T <br />W <br />Z) <br />Z <br />W <br />a <br />a <br />z <br />W <br />x <br />0 <br />wsb <br />Memorandum <br />To: City of Hugo <br />From: Candace Amberg, WSB <br />Date: July 10, 2020 <br />Re: Lions Park Master Plan <br />WSB Project No. 016030-000 <br />Lions Park Master Plan <br />The 2020 Lions Park Master Plan reflects updates to the previous master plan according to <br />current needs and desires for a potential phase one implementation project. The master plan was <br />presented at the joint City of Hugo City Council and Parks Commission on June 291h for review <br />and comment for modifications to finalize the Lions Park Feasibility Study with corresponding cost <br />estimate. <br />The 2020 Master Plan is summarized as follows: <br />Vehicular Circulation: <br />• The City Hall parking lot contains 6 ADA stalls along the front of the building with the <br />remainder of the parking lot to contain approximately 58 parking stalls. The parking lot is <br />configured so that Fitzgerald Ave acts as an entrance drive to the parking lot but the use <br />of the center island does not allow straight through traffic into the parking lot in order to <br />slow traffic. <br />• Fitzgerald Ave north of the City Hall parking lot is shown widened to a 32' wide urban <br />road with parallel parking along Lions Park containing approximately 9 stalls. The parallel <br />parking stalls are optimal locations for setting up food trucks or other vendors to be used <br />in conjunction with park lawn activities. These can also serve as a primary entrance into <br />the park space for vehicles for select activities/events. <br />• Upper 146th is shown with a total of approximately 48 to 50 pull -in parking stalls along <br />Lions Park. <br />• Finale Ave is shown as a 28' wide urban road with approximately 16 parallel parking <br />stalls along Lions Park. <br />• 147th St is shown as a 26' wide urban road with no parking on the roadway. <br />• The City of Hugo intends to conduct additional street feasibility design studies to <br />determine final road improvements, design and impacts along with overall stormwater <br />strategy and design. <br />• A parking lot (possibly a future phase) is shown in the northwest corner of the park with <br />approximately 60-67 parking stalls. An area is identified for a rain garden, though a future <br />stormwater design will be conducted with the road feasibility study. <br />K:\016030-000\Admin\Docs\016030_2020-0710_Master Plan Summary.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.