Laserfiche WebLink
ditch on the east side of the development. The passive trail will be consistent with making <br />connections within the Greenway Corridor as indicated in the 2040 Comprehensive <br />Place. Sidewalks are required to be built in developments with lots less than 80' wide <br />(Sec. 90-336) and the developer has included them where trails are not being constructed. <br />5. STAFF RECOMMENDATION: <br />Staff recommends approval of the proposed park dedication fees with the Meadows at <br />Hugo. <br />ATTACHMENTS: <br />1. Location Map <br />2. Applicant's Narrative dated January 26, 2021 <br />3. The Meadows at Hugo Preliminary Plat received February 4, 2021 <br />4. Overall Site Plan dated January 26, 2021 <br />5. Park Dedication Policy <br />6. Trail and Sidewalk Plan <br />7. Neighborhood Park Service Areas Plan <br />8. Greenway Plan <br />-3- <br />The Meadows at Hugo <br />February 17, 2021 <br />