My WebLink
|
Help
|
About
|
Sign Out
Home
2022.04.04 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2022 CC Packets
>
2022.04.04 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2022 8:41:08 AM
Creation date
4/1/2022 8:40:42 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
4/4/2022
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 3 <br /> <br />not exceed $28,500 as per the Scope of Services attached to this memorandum as <br />Exhibit A. The County will pay 50% of the design engineering costs necessary to add the <br />traffic signal and associated pedestrian ramps to the Project. <br /> <br />c. Construction Engineering/Contract Administration <br />Construction engineering/contract administration costs will be construction <br />observation, construction testing, construction administration, staking, conducting and <br />recording the pre-bid, pre-construction and weekly construction meetings, reviewing <br />monthly pay estimates, labor compliance, and other administrative functions necessary <br />for the Project. Construction engineering/contract administration is 8% of the <br />construction cost. Based on the County’s share of the construction cost, the County will <br />pay the prorated cost of construction engineering/contract administration for its share <br />of the project. After the City has awarded the construction contract, the City will provide <br />to the County an updated estimate of the construction engineering/contract <br />administration cost. <br /> <br />d. Actual County costs and shares will be based on the following: <br />i. Construction will be based on the contractor's unit prices and final quantities at <br />Project completion including all contract changes. <br />ii. Design engineering will be based on the actual design costs incurred by the city <br />directly attributable to inclusion of the traffic signal and associated pedestrian <br />ramps into the Project. <br />iii. Construction engineering/contract administration will be based on the <br />contractor’s unit prices and final quantities at Project completion including all <br />contract changes and liquidated damages. <br /> <br /> <br /> <br /> <br /> <br /> <br />WASHINGTON COUNTY CITY OF HUGO <br /> <br /> <br /> <br />County Engineer Date City Engineer Date <br /> <br /> <br /> <br /> <br /> Mayor Date
The URL can be used to link to this page
Your browser does not support the video tag.