My WebLink
|
Help
|
About
|
Sign Out
Home
2022.05.16 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2022 CC Packets
>
2022.05.16 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 2:48:23 PM
Creation date
5/16/2022 2:45:58 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
5/16/2022
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES -PLUMBINGA. COORDINATE INSTALLATION OF ALL NEW PIPING WITH STRUCTURAL ELEMENTS AND ALL NEW DUCTWORK, CEILINGS, LIGHTS, ETC.B. COORDINATE WITH ARCHITECTURAL DRAWINGS ON REQUIREMENTS FOR ALL CHASES, WALLS, FURROUTS, ETC. REQUIRED FOR DUCTWORK AND PIPING.C. PROVIDE ISOLATION VALVES AT EVERY BRANCH TAKE-OFF FROM MAINS. LOCATE VALVES NEXT TO MAIN WITH HANDLES EASILY ACCESSIBLE.D. REFER TO RISER DIAGRAMS AND DETAILS FOR ADDITIONAL VALVES AND SIZES.E. REFER TO PLUMBING FIXTURE ROUGH-IN AND FLOOR DRAIN SCHEDULES FOR PIPE SIZES TO INDIVIDUAL FIXTURES.F. PITCH ALL UNDERFLOOR SANITARY PIPING AT 1/4" PER FOOT (MIN.) UNLESS NOTED OTHERWISE.G. PITCH ALL RAINWATER PIPING AT 1/8" PER FOOT (MIN.) UNLESS NOTED OTHERWISE.H. PROVIDE ALL EXPOSED PIPES WITH A FINISH SUITABLE AND READY FOR FIELD PAINTING.I. INSTALL ALL EQUIPMENT AND HORIZONTAL PIPING AS HIGH AS POSSIBLE UP TIGHT TO STRUCTURE.J. IDENTIFY ANY INSULATION, FITTINGS, TILE, PLASTER, ETC., WHICH MAY CONTAIN ASBESTOS AND NOTIFY OWNER. OWNER SHALL REMOVE ASBESTOS UNDER A SEPARATE CONTRACT.K. FIELD VERIFY ALL EXISTING CONDITIONS, PIPING, DUCT LOCATIONS, SIZES, ETC.L. REMOVE AND REINSTALL ALL EXISTING CEILING SYSTEMS REQUIRED FOR NEW DUCT SYSTEMS UNLESS NOTED OTHERWISE ON ARCHITECTURAL DRAWINGS.M. REMOVE AND REROUTE ANY EXISTING PIPING REQUIRED FOR INSTALLATION OF NEW EQUIPMENT, DUCTS, PIPES, DIFFUSERS, LIGHTS, ETC. UNLESS NOTED OTHERWISE ON ARCHITECTURAL DRAWINGS.N. EXISTING MECHANICAL DRAWINGS ARE AVAILABLE FOR CONTRACTOR'S REVIEW AND INSPECTION. CALL TO MAKE ARRANGEMENTS.O. PROVIDE CLEANOUT AT CONNECTIONS TO ALL EXISTING WASTE, VENT, AND RAINWATER SYSTEMS, EVERY 50' FOR SANITARY AND RAINWATER PIPES LESS THAN 3", EVERY 100' FOR SANITARY AND RAINWATER PIPES 3" AND LARGER, AND AT THE BASE OF ALL SANITARY AND RAINWATER RISERS.P10P2P3P8P1P1P21 1/4"3/4"2"3/4"2 1/2"1 1/4"1 1/4"1"ORWORW1213151617GFE4" UP TO ORD(2700 SF)4" UP TO RD(2700 SF)4" UP TO RD(1900 SF)4" UP TO ORD(1900 SF)4" UP TO RD(1700 SF)4" UP TO ORD(1700 SF)4" UP TO ORD(1900 SF)4" UP TO RD(1900 SF)4" UP TO ORD(2700 SF)4" UP TO RD(2700 SF)RWRWRWRWORW6" ORWL(2700 SF)6" RWL(2700 SF)8" RWL(4600 SF)5" RWL(1700 SF)8" RWL(6300 SF)8" RWL @ 1/4"/FT(10900 SF)8" RWL(4600 SF)5" RWL(1900 SF)4" RWL @ 1/4"/FT(1900 SF)6" RWL(2700 SF)8" ORWL @ 1/4"/FT(10000 SF)6" ORWL @ 1/4"/FT(5400 SF)6" ORWL(4600 SF)4" @ 1/4"/FT(1900 SF)6" ORWL(3600 SF)6" @ 1/2"/FT(6300 SF)ORWORW1"2"SANVVV2"2"2"F1F1F1F134111111P68287445612834P111681311149111110109222811834B115CLASSROOMB114CLASSROOMB113CLASSROOMB100CIRCULATIONB111CLASSROOMB112CLASSROOMB110FLEX ROOMB109FLEX ROOMB108FLEX ROOMB116SMALL GROUPB107VESTIBULEB101TOILETB103TOILETB104TOILETB105TOILETB106MECH / ELECA106READING AREA41515171213151617GFEP4P4P4P4P4P10P81 1/4"3/4"2"3/4"2"2 1/2"1 1/4"1 1/4"1"ORWORW6"VP6B115CLASSROOMB114CLASSROOMB113CLASSROOMB100CIRCULATIONB111CLASSROOMB112CLASSROOMB110FLEX ROOMB109FLEX ROOMB108FLEX ROOMB116SMALL GROUPB107VESTIBULEB101TOILETB103TOILETB104TOILETB105TOILETB106MECH / ELECA106READING AREA4" UP TO ORD(2700 SF)4" UP TO RD(2700 SF)4" UP TO RD(1900 SF)4" UP TO ORD(1900 SF)4" UP TO RD(1700 SF)4" UP TO ORD(1700 SF)4" UP TO ORD(1900 SF)4" UP TO RD(1900 SF)4" UP TO ORD(2700 SF)4" UP TO RD(2700 SF)6" ORWL(2700 SF)6" RWL(2700 SF)8" RWL(4600 SF)5" RWL(1700 SF)8" RWL(6300 SF)8" RWL @ 1/4"/FT(10900 SF)8" RWL(4600 SF)5" RWL(1900 SF)4" RWL @ 1/4"/FT(1900 SF)6" RWL(2700 SF)8" ORWL @ 1/4"/FT(10000 SF)6" ORWL @ 1/4"/FT(5400 SF)6" ORWL(4600 SF)4" @ 1/4"/FT(1900 SF)6" ORWL(3600 SF)6" @ 1/2"/FT(6300 SF)ORWORWRWRWRWRWORWORWORWSANVVVORWORWRWRWRWRWORWORWORWSANVVV3411111182874456128341681311149111010922281183411822VVVV111111113/4"3/4"1 1/2"1/2"1/2"1 1/2"P11P2P3P1P1P2F1F1F1F1114151517FEDCBA12345678AMNNorthCheck:Drawn:Date:Comm:License Number:I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensedunder the laws of the State of Minnesota.Scale:DateProfessional Engineer3/22/20224855 Bloom AveWhite Bear Lake, MN 551103/22/2022 1:30:03 PMBIM 360://Oneka Elementary School Addition and Renovation/M21_Oneka ES_Central_kweinzierl.rvt1/8" = 1'-0"INDEPENDENT SCHOOLDISTRICT #624ONEKAELEMENTARYSCHOOL ADDITIONAND RENOVATIONM2.01bMAIN LEVELPLUMBING PLAN -AREA B4888 HERITAGE PKWY NORTHHUGO, MN 55038SITE PLAN APPLICATION -NOT FORCONSTRUCTIONKEWKEW3/22/2022R20-4013.000KEITH E. WEINZIERL41638KEYNOTES1 RD/ORD SAHLL CONFORM TO ICC 500 STORM SHELTERREQUIREMENTS.2 2" VENT UP TO 2" VTR. VTR SHALL CONFORM TO ICC 500 STORMSHELTER REQUIREMENTS.3 PROVIDE LINE SIZE RWL/ORWL NOZZLE. INSTALL NOZZLE 1'-6" A.F.F.4 PROVIDE PIPE PENETRATION SHROUD. SHROUD SHALL CONFORMTO ICC 500 STORM SHELTER REQUIREMENTS.5 3" SAN UP TO F2.6 2" VENT UP.7 3" SAN DOWN. WCO.8 FCO.9 4" SAN DOWN.10 PROVIDE VALVED SHOCK ABSORBER. LOCATE IN ADJACENT,ACCESSIBLE CEILING.11 PROVIDE WCO IN SAN UNDER PLUMBING FIXTURE.12 PROVIDE STOP AND WASTE VALVE IN SUPPLY SERVING FIXTURE.13 3/4" CW UP TO P9.14 1/2" CBV. BALANCE TO 1 GPM.15 CONNECT HORIZONTAL RW/ORW PIPE TOGETHER TO THE VERTICALRW/ORW LEADER.16 PROVIDE STOP AND CHECK VALVES IN SUPPLIES SERVING FIXTURE.17 RWL NOZZLE TO DISCHARGE INTO STORM CATCH BASIN. CATCHBASIN BY OTHERS. REFER TO CIVIL DRAWINGS.1/8" = 1'-0"MAIN LEVEL PLUMBING PLAN - AREA B BASE BID11/8" = 1'-0"MAIN LEVEL PLUMBING PLAN - AREA B ALTERNATE 22RevisionsDescription Date Num
The URL can be used to link to this page
Your browser does not support the video tag.