My WebLink
|
Help
|
About
|
Sign Out
Home
2022.06.06 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2022 CC Packets
>
2022.06.06 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2022 2:44:58 PM
Creation date
6/6/2022 2:37:25 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
6/9/2022
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tough Mudder Twin Cities 2022 Event Operations Plan <br />Tough Mudder will contract with local ambulance providers at each venue to ensure ALS-level coverage <br />for significant injuries or medical emergencies. The ambulance contracts are typically executed about <br />30 days before the event date. Information about each event's ambulance provider, the event Incident <br />Action Plan, and further details can be provided on request 30 days from the event. <br />Additional information on Medical Arrangements can be found in the attached OCR Emergency Medical <br />Action Plan. <br />Incident Management <br />The following measures have been put in place to ensure that any incident that does occur is quickly <br />identified and responded to in an efficient and effective manner: <br />●Emergency Action Plans (EAPs) have been developed for a number of specific scenarios, and <br />event team staff have been briefed on how to respond if such incidents occur. <br />●Key Event Operations Roles have been identified for the event, responsibilities for each role <br />have been clearly defined, and each role will be filled by an experienced Tough Mudder staff <br />member. <br />●Details of all major incidents will be logged in the ECC by ‘Control’ or a logger on a real-time <br />basis, ensuring an up-to-date record of what has occurred, actions taken in response, and <br />relevant timings. <br />●A number of medical staff as well as 2-3 ambulances will be on site throughout the event. <br />●The local Police and Fire Departments have been informed about the event and appropriate <br />contacts have been identified should additional assistance be required on site. <br />●Emergency vehicle access points and a helicopter landing area have been identified for the site <br />and included in plans, should these be required. <br />●Incident Report Forms are available on site and all staff will be instructed to complete these <br />for any incidents they witness/report. <br />●A Tough Mudder Operations Executive will be on-duty at all times during the event (potentially <br />off-site), and will be available to assist in arranging additional support for and providing <br />guidance to the Event Director if required. <br />Further details about incident management arrangements will be available in the following documents <br />upon request: <br />●Emergency Action Plans <br />o Death or Serious Injury; <br />o Obstacle Failure or Collapse; <br />o Major Traffic Incident; <br />o Severe Weather; <br />o Evacuation; <br />9/16
The URL can be used to link to this page
Your browser does not support the video tag.