My WebLink
|
Help
|
About
|
Sign Out
Home
2022.06.06 RESO 2022 - 33 Shores of Oneka Lake Pre Plat
Hugo
>
City Council
>
City Council Resolutions
>
2022 CC Resolutions
>
2022.06.06 RESO 2022 - 33 Shores of Oneka Lake Pre Plat
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2022 2:03:48 PM
Creation date
6/7/2022 10:34:56 AM
Metadata
Fields
Template:
City Council
Document Type
Resolutions
Meeting Date
6/6/2022
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution 2022-33 <br />Page 3 <br />6. Outlot Use and Ownership: <br />Outlot <br />Acres <br />Ownership <br />Use <br />Wetlands/Future <br />Development <br />A <br />1.54 <br />Current Owner (Fenway Land <br />Comp an <br />B <br />11.37 <br />City of Hugo <br />Stormwater management, <br />wetlands, and right-of-way <br />C <br />5.04 <br />Current Owner (Fenway Land <br />Conran) <br />City of Hugo <br />City of Hugo <br />Future Development <br />Stormwater management/ <br />Wetlands <br />D <br />8.30 <br />E <br />4.41 <br />Stormwater management <br />F <br />0.54 <br />City of Hugo <br />Powerline easement/Future <br />Trail Corridor <br />G <br />31.3 <br />City of Hugo <br />Public open space, <br />wetlands, trail corridor <br />H <br />1.68 <br />Ct of Hugo <br />Stormwater management <br />I <br />1.70 <br />City of Hugo <br />Stormwater management <br />J <br />6.44 <br />City of Hugo <br />Stormwater management <br />7. The developer shall comply with the City standards for street lighting within the <br />public right-of-way. <br />8. Prior to the release of the final plat for recording, the developer must comply with the <br />following conditions. <br />a. The developer must comply with all conditions outlined in the City <br />Engineer's memos dated May 4, 2022. <br />b. The developer must comply with Resolution 2022-32, for the PUD. <br />c. The development shall comply with the Fire Chief s requirements <br />regarding fire flow calculations, the location of fire hydrants, fire <br />department connections, and fire lane signage. <br />d. A permit from Rice Creek Watershed District shall be issued for the ditch <br />crossing for construction of Street A. <br />e. The developer must obtain all necessary stormwater management and <br />WCA permits from the City. <br />f. The developer shall obtain all necessary local, state, and federal permits. <br />g. The developer shall provide the Homeowners Association documents for <br />review and approval by staff. <br />
The URL can be used to link to this page
Your browser does not support the video tag.