Laserfiche WebLink
Page 3 of 5 <br /> <br /> <br />negotiation will be acquired by the County through eminent domain proceedings. <br />c. Neither the City nor the County shall charge the other for use of its right-of-way for the purposes of <br />execution of the Project. <br /> <br />5. County-Furnished Material <br />County-Furnished Material shall be items such as structural steel, traffic signal control equipment, and <br />detection equipment which are separately procured outside of the construction contract and installed <br />within the Project limits. The City shall pay fifty percent (50%) of the final County-furnished material cost <br />at actual purchase cost including delivery fees. <br /> <br />The costs and shares attributable to the County and payable to the City as shown in Table 1 are merely <br />estimated and a final reconciliation of costs as set forth in Section G below shall be done at the end of the <br />Project. Actual County costs and shares are based on the following: <br />a. Construction shall be based on the contractor's unit prices and final quantities at Project completion <br />including all contract changes. <br />b. Design engineering shall be based on the contractor’s unit prices at the time of contract award. <br />c. Construction engineering/contract administration shall be based on the contractor’s unit prices and final <br />quantities at Project completion including all contract changes and liquidated damages. <br />d. Right of way shall be based on the final costs to acquire right of way. <br />e. County-Furnished Material costs shall be based on the actual purchase costs to acquire County- <br />furnished material including delivery fees. <br /> <br />F. PAYMENT <br />1. Construction and Construction Engineering/Contract Administration <br />a. After the City has awarded the construction contract, the City shall update Exhibit B to conform the <br />Exhibit to the amounts in the awarded bid and shall invoice for payment the County 10 percent of <br />the County’s estimated construction and construction engineering/contract administration cost <br />based on the updated Exhibit B. <br />b. During construction, the City shall submit to the County partial estimates of work performed by the <br />contractor. The County shall pay to the City its share of the partial estimate as determined in Section <br />E. <br />c. Upon substantial completion of the work the City shall submit to the County a final invoice and final <br />reconciliation of costs. The reconciliation will add or subtract contract amendments to the County’s <br />Project components, adjustments for liquidated damages pursuant to Section H, and previous <br />Project cost payments made by the County to the City. <br />2. The costs set forth in Table 1 for design engineering and right of way shall be separate line items on the <br />invoice and paid by the County on a reimbursable basis. <br />3. In the event that the County paid more in advance than the actual cost of the County’s portion of the <br />TABLE 1 – ESTIMATED COSTS <br />Washington County Cost Summary <br />ITEM TOTAL COST COUNTY <br />SHARE <br />COUNTY <br />COST <br />Construction $2,030,352 See Exhibit B $116,326 <br />Design Engineering $28,500 50% $14,250 <br />Construction Engineering/Contract Administration $162,428 5.73% $9,306 <br />Right of Way $0 N/A $0 <br />County-Furnished Material $164,656 50% $82,328 <br />TOTAL ESTIMATED COST $2,385,936 $222,210