Laserfiche WebLink
Bid Tabulation2022 Oneka Parkway Improvements (#8195893)Owner: City of HugoS.A.P. 224-111-002 and S.A.P. 082-608-012WSB Project No. 018888-000Bid Opening 06/29/2022 01:00 PM CDTDENOTES CORRECTED FIGURESecLine # Item # Item Description Unit QuantityUnit Price ExtensionBase Bid Total1 2021.501 MOBILIZATIONLS 1 $150,000.00 $150,000.002 2021.601 CONTRACTOR COORDINATION L S 1 $1,000.00 $1,000.003 2101.502 CLEARING EACH 20 $350.00 $7,000.004 2101.502 GRUBBING EACH 20 $350.00 $7,000.005 2104.502 REMOVE DRAINAGE STRUCTURE EACH 2 $500.00 $1,000.006 2104.502 REMOVE SIGN EACH 16 $100.00 $1,600.007 2104.503 REMOVE CURB AND GUTTER L F 11000 $10.00 $110,000.008 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LF 1500 $5.00 $7,500.009 2104.503 REMOVE SEWER PIPE (STORM) L F 135 $10.00 $1,350.0010 2104.504 REMOVE CONCRETE DRIVEWAY PAVEMENT S Y 20 $8.00 $160.0011 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT S Y 200 $5.00 $1,000.0012 2104.504 REMOVE BITUMINOUS PAVEMENT S Y 11200 $4.50 $50,400.0013 2104.518 REMOVE BITUMINOUS WALK S F 7340 $2.00 $14,680.0014 2104.518 REMOVE CONCRETE WALK S F 9230 $2.00 $18,460.0015 2106.507 EXCAVATION - COMMON (P) CY 510 $25.00 $12,750.0016 2106.507 EXCAVATION - SUBGRADE (P) C Y 316 $25.00 $7,900.0017 2106.507 SELECT GRANULAR EMBANKMENT (CV) (P) C Y 316 $50.00 $15,800.0018 2106.507 EXCAVATION - COMMON C Y 310 $35.00 $10,850.0019 2106.507 EXCAVATION - SUBGRADE C Y 710 $35.00 $24,850.0020 2106.507 SELECT GRANULAR EMBANKMENT (CV) C Y 710 $50.00 $35,500.0021 2108.504 GEOTEXTILE FABRIC TYPE 5 S Y 880 $2.00 $1,760.0022 2112.519 SUBGRADE PREPARATION RDST 42 $200.00 $8,400.0023 2123.61 STREET SWEEPER (WITH PICKUP BROOM) HOUR 80 $150.00 $12,000.0024 2123.61 1.5 CU YD BACKHOE HOUR 20 $750.00 $15,000.0025 2211.507AGGREGATE BASE (CV) CLASS 5 (P) C Y 115 $32.00 $3,680.0026 2211.507AGGREGATE BASE (CV) CLASS 5 C Y 310 $32.00 $9,920.0027 2211.509AGGREGATE BASE CLASS 5 TON 50 $50.00 $2,500.0028 2231.509 BITUMINOUS PATCHING MIXTURE TON 70 $200.00 $14,000.0029 2232.504 MILL BITUMINOUS SURFACE (2.0") S Y 18600 $3.00 $55,800.0030 2331.603 JOINT ADHESIVE L F 27000 $1.00 $27,000.0031 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GAL 2800 $3.50 $9,800.0032 2360.504 TYPE SP 9.5 WEAR CRS MIX(2,C) 3.0" THICK S Y 40 $45.00 $1,800.0033 2360.509 TYPE SP 9.5 WEARING COURSE MIX (2,C) TON 4100 $85.00 $348,500.0034 2360.509 TYPE SP 12.5 WEARING COURSE MIX (2,C) TON 2000 $1.00 $2,000.0035 2501.606 CHEMICAL GROUT GAL 200 $200.00 $40,000.0036 2502.602 IRRIGATION SYSTEM PROVISION L S 1 $20,000.00 $20,000.0037 2503.503 15" RC PIPE SEWER DES 3006 CL V L F 135 $65.00 $8,775.0038 2503.602 CONNECT TO EXISTING STORM SEWER EACH 2 $1,500.00 $3,000.0039 2504.602ADJUST GATE VALVE & BOX EACH 5 $500.00 $2,500.0040 2505.601 UTILITY COORDINATION L S 1 $2,000.00 $2,000.0041 2506.502 CASTING ASSEMBLY EACH 2 $1,200.00 $2,400.0042 2506.503 CONST DRAINAGE STRUCTURE DES 48-4020 L F 11 $650.00 $7,150.0043 2506.602 CHIMNEY SEAL EACH 11 $350.00 $3,850.0044 2506.602ADJUST FRAME & RING CASTING EACH 11 $500.00 $5,500.0045 2506.602 REPAIR DRAINAGE STRUCTURE EACH 72 $1,000.00 $72,000.00Engineer EstimateMidstate Landscaping & ExcavatingUnit Price Extension Unit Price Extension$123,532.50 $123,532.50$130,000.00 $130,000.00$907.50 $907.50 $15,000.00 $15,000.00$660.00 $13,200.00 $962.70 $19,254.00$660.00 $13,200.00 $582.69 $11,653.80$1,020.00 $2,040.00$1,658.97 $3,317.94$60.00 $960.00 $100.87 $1,613.92$2.73 $30,030.00 $8.45 $92,950.00$3.18 $4,770.00 $2.28 $3,420.00$15.11 $2,039.85 $37.88 $5,113.80$23.38 $467.60 $53.93 $1,078.60$4.68 $936.00 $18.59 $3,718.00$5.47 $61,264.00 $8.00 $89,600.00$0.51 $3,743.40 $0.78 $5,725.20$0.61 $5,630.30 $0.76 $7,014.80$18.33 $9,348.30 $35.32 $18,013.20$23.32 $7,369.12 $35.14 $11,104.24$5.93 $1,873.88 $53.59 $16,934.44$15.08 $4,674.80 $35.32 $10,949.20$3.95 $2,804.50 $27.56 $19,567.60$3.95 $2,804.50 $53.59 $38,048.90$2.16 $1,900.80 $5.21 $4,584.80$0.01 $0.42 $356.77 $14,984.34$132.00 $10,560.00 $285.01 $22,800.80$203.50 $4,070.00 $181.59 $3,631.80$56.40 $6,486.00 $29.13 $3,349.95$8.50 $2,635.00 $29.13 $9,030.30$20.40 $1,020.00 $29.13 $1,456.50$173.94 $12,175.80 $139.34 $9,753.80$1.96 $36,456.00 $2.66 $49,476.00$0.89 $24,030.00 $1.39 $37,530.00$4.06 $11,368.00 $4.43 $12,404.00$78.93 $3,157.20 $92.47 $3,698.80$91.39 $374,699.00 $127.94 $524,554.00$88.22 $176,440.00 $120.33 $240,660.00$133.83 $26,766.00 $113.00 $22,600.00$20,000.00 $20,000.00$20,000.00 $20,000.00$62.25 $8,403.75 $72.33 $9,764.55$510.00 $1,020.00 $1,148.05 $2,296.10$204.00 $1,020.00 $161.39 $806.95$1,020.00 $1,020.00$6,000.00 $6,000.00$1,980.00 $3,960.00$910.33 $1,820.66$1,388.18 $15,269.98$1,120.60 $12,326.60$512.73 $5,640.03 $677.50 $7,452.50$458.18 $5,039.98 $161.39 $1,775.29$2,257.50 $162,540.00$4,454.67 $320,736.24Dresel Contracting Inc.PAGE 3