Laserfiche WebLink
Bid Tabulation2022 Oneka Parkway Improvements (#8195893)Owner: City of HugoS.A.P. 224-111-002 and S.A.P. 082-608-012WSB Project No. 018888-000Bid Opening 06/29/2022 01:00 PM CDTDENOTES CORRECTED FIGURESecLine # Item # Item DescriptionUnit QuantityUnit Price Extension Unit Price Extension Unit Price Extension Unit Price ExtensionEngineer EstimateNorth Valley, Inc.Forest Lake Contracting, Inc. Bituminous Roadways Inc.46 2521.518 6" CONCRETE WALKS F 3450$8.00 $27,600.00$6.44 $22,218.00$8.50 $29,325.00$13.00 $44,850.0047 2521.518 3" BITUMINOUS WALKS F 7340$5.00$36,700.00$3.84 $28,185.60$5.00 $36,700.00$4.00 $29,360.0048 2531.503 CONCRETE CURB & GUTTER DESIGN SPECIAL L F150$18.00 $2,700.00$37.56 $5,634.00$35.00 $5,250.00$19.00 $2,850.0049 2531.503 CONCRETE CURB & GUTTER DESIGN B618L F11070$18.00 $199,260.00$20.39 $225,717.30$19.00 $210,330.00$20.00 $221,400.0050 2531.504 6" CONCRETE DRIVEWAY PAVEMENTS Y 100$100.00 $10,000.00 $128.78 $12,878.00 $137.00 $13,700.00$67.00 $6,700.0051 2531.618 TRUNCATED DOMESS F 556$50.00 $27,800.00 $107.32 $59,669.92 $100.00$55,600.00$53.00 $29,468.0052 2563.601 TRAFFIC CONTROLLS 1$50,000.00 $50,000.00 $21,410.18 $21,410.18 $23,000.00 $23,000.00 $28,166.00 $28,166.0053 2565.501 EMERGENCY VEHICLE PREEMPTION SYSTEM LS 1$7,500.00 $7,500.00 $3,834.47 $3,834.47 $7,000.00 $7,000.00 $3,673.00 $3,673.0054 2565.516 TRAFFIC CONTROL SIGNAL SYSTEMSYS 1 $275,000.00 $275,000.00 $191,690.36 $191,690.36 $180,000.00 $180,000.00 $183,605.00 $183,605.0055 2573.501 STABILIZED CONSTRUCTION EXITLS 1$1,000.00 $1,000.00$2,682.98 $2,682.98 $3,500.00 $3,500.00 $8,822.00 $8,822.0056 2573.502 STORM DRAIN INLET PROTECTIONEACH 80$200.00 $16,000.00 $268.30 $21,464.00 $175.00 $14,000.00 $135.00 $10,800.0057 2573.503 SEDIMENT CONTROL LOG TYPE STRAW BIOROLL L F 1000$3.00 $3,000.00$2.56 $2,560.00$2.00 $2,000.00$3.00 $3,000.0058 2574.507 COMMON TOPSOIL BORROWC Y 600$38.00$22,800.00$51.48 $30,888.00$38.00 $22,800.00$51.00 $30,600.0059 2574.508 FERTILIZER TYPE 3LB 500$5.00$2,500.00$1.92 $960.00$1.50 $750.00$1.30 $650.0060 2575.505 SEEDINGACRE 1.5$8,500.00 $12,750.00 $575.35 $863.03 $450.00 $675.00 $2,630.00 $3,945.0061 2575.508 SEED MIXTURE 25-151LB 200$5.00 $1,000.00$8.89 $1,778.00$6.95 $1,390.00$8.80 $1,760.0062 2575.508 HYDRAULIC STABILIZED FIBER MATRIXLB 5000$2.00 $10,000.00$2.11 $10,550.00$1.65 $8,250.00$1.60 $8,000.0063 2575.523 WATERMGAL 120$65.00 $7,800.00$53.66 $6,439.20$60.00 $7,200.00$76.00 $9,120.0064 2582.503 4" SOLID LINE PAINTL F 4400$1.00$4,400.00$0.48 $2,112.00$0.45 $1,980.00$0.50 $2,200.0065 2582.503 12" SOLID LINE PAINTL F 1800$5.00$9,000.00$3.80 $6,840.00$3.54 $6,372.00$3.80 $6,840.0066 2582.503 4" BROKEN LINE PAINTL F 290$1.00 $290.00$0.48 $139.20$0.45 $130.50$0.50 $145.0067 2582.503 4" DBLE SOLID LINE PAINTL F550$1.50 $825.00$0.97 $533.50$0.90 $495.00$1.00 $550.0068 2582.503 24" SOLID LINE PREF THERMO GR IN ESRL F 500$10.00 $5,000.00$36.49 $18,245.00$34.00 $17,000.00$36.00 $18,000.0069 2582.518 PAVT MSSG PAINTS F 530$8.00 $4,240.00$3.80 $2,014.00$3.60 $1,908.00$3.80 $2,014.0070 2506.602 GROUT CATCH BASIN OR MANHOLEEACH 72$650.00 $46,800.00 $429.28 $30,908.16 $1,600.00 $115,200.00 $331.00 $23,832.00Base Bid Total$1,942,100.00$1,950,432.25$1,942,533.50$1,991,974.00ALTERNATE 1 - FREEDOM TRAIL IMPROVEMENTS71 2104.518 REMOVE BITUMINOUS WALKS F 19800$2.00$39,600.00$0.54 $10,692.00$0.80 $15,840.00$1.00 $19,800.0072 2521.518 3" BITUMINOUS WALKS F 19800$5.00$99,000.00$2.11 $41,778.00$5.00 $99,000.00$3.10 $61,380.0073 2575.603 ROOT BARRIERL F 3900$8.00 $31,200.00$9.78 $38,142.00$10.00$39,000.00$20.00 $78,000.00Alternate 1 Total$169,800.00$90,612.00$153,840.00$159,180.00TOTAL BASE BID AND ALTERNATE 1$2,111,900.00$2,041,044.25$2,096,373.50$2,151,154.00PAGE 2