Ms. Rachel Juba <br />August 10, 2022 <br />Page 2 <br />S:\Users\R_Juba\DEVELOPMENT PROJECTS\The Meadows at Hugo\The Meadows at Hugo <br />Second Addition\Engineers Memo and Red-lined Comments\Emgineers Memo-Meadows at <br />Hugo 2nd Addition 081022.docx <br />Utility Plan <br /> <br />8. As identified in the City’s Comprehensive Water Supply and Distribution Plan, a 24” trunk <br />watermain was extended north from the water tower location as part of the 1st Addition. The <br />remaining watermain construction for the 2nd Addition connects to two 8” watermain stubs on <br />Finale Avenue and 161st Street constructed with the 1st Addition. <br />9. Sanitary sewer service is being extended by connecting to the stub on Finale Avenue with the <br />1st Addition. <br />10. There are no oversizing with the remaining utility installation as part of the 2nd Addition. <br />11. The applicant should gray out or remove plan sheets or profile/plan linework of utility mains <br />and services that were installed with Phase 1 to better identify what will be installed with the <br />2nd Addition/Phase 2. <br />12. Detailed redline comments for street and utilities have been provided to the applicants <br />engineer for the 2nd Addition. <br /> <br />Stormwater Management/Wetlands <br /> <br />13. Applicant is meeting rate control and water quality stormwater requirements through multiple <br />stormwater ponds adjacent to and hydraulically connected to the wetlands throughout the <br />property. <br />14. The applicant has obtained a Rule I Permit with RCWD for work adjacent to and within JD 3. <br />15. The applicant is showing that all proposed lots meet the City’s freeboard requirements. <br />16. Detailed redline drainage comments have been provided to the applicant for the 2nd Addition. <br />17. A wetland delineation on the parcel was approved during the fall of 2018. <br />18. The plan has a number of impacts to wetlands totaling 1.78 acres and the applicant has <br />provided an on-site wetland replacement plan, resulting in a total of 3.98 acres of credit, <br />meeting requirements. <br /> <br />Thank you for the opportunity to provide comments on this project. If you have any questions, <br />please do not hesitate to contact me at 651-286-8463. <br /> <br />Sincerely, <br /> <br />WSB <br /> <br /> <br /> <br /> <br />Mark Erichson, PE <br />City Engineer <br /> <br />cc: Scott Anderson, Public Works Director (email only) <br /> Liz Finnegan, Senior Engineering Technician (email only) <br /> Peter Knaeble, Golden Valley Land Co. (email only) <br />Matt Pavek, Civil Site Group (email only) <br /> <br />