Laserfiche WebLink
Resolution 2022-____ <br />Page 2 of 3 <br /> <br /> <br /> <br />Architecture <br /> <br />a. The applicant shall submit building material and glass samples for review and approval <br />by city staff. <br /> <br />b. The percentage of metal covering the exterior of the building shall be 20 % or less. The <br />architectural plans shall be reviewed and approved by staff. <br /> <br />c. The internal roof drainage system that shall be integrated into the building design and <br />shall be reviewed and approved by staff. <br /> <br />d. The trash enclosure shall be included in the plans and shall be screened with materials <br />consistent with the building material and shall be reviewed and approved by staff. <br /> <br />Landscaping/lighting <br /> <br />a. The developer shall show all areas that will be seeded, sodded, and irrigated on the <br />landscape plan. <br /> <br />b. The landscaping shall be irrigated to ensure establishment of plantings. <br /> <br />c. The developer shall provide overstory deciduous trees and shrubs to substitute the <br />minimum requirement of ornamental trees by City ordinance, in the respective amounts <br />specified by the landscape plan dated August 5, 2022. <br /> <br />d. The developer shall install temporary landscaping for the training area until the proposed <br />building is constructed. Staff shall review and approve a temporary landscape plan. <br /> <br />e. The lighting plan shall meet the standards in City Code Section 90-239 Lighting. <br /> <br />f. The applicant shall submit cut sheets for the pole and wall mounted light fixtures to be <br />reviewed and approved by staff. <br /> <br />5. Prior to the issuance of a Certificate of Occupancy, the developer must comply with the following <br />conditions: <br /> <br />a. All exterior mechanical equipment must be screened from view of adjacent properties. <br />Staff shall perform an inspection when equipment is installed to ensure compliance with <br />City code. <br /> <br />b. Any areas of the street, sidewalk, and trail connection that are disturbed with the <br />construction shall be restored to the City’s satisfaction. <br /> <br />c. All landscaping shall be installed per the plans approved by staff. <br /> <br /> <br /> <br />