Laserfiche WebLink
<br />Page 7 <br /> <br />Streets/Access <br /> <br />The applicant is proposing two access locations from the south from Oneka Parkway and <br />Fairoaks Avenue North. The applicant has also provided access to properties to the north, east, <br />and wast of the development. Staff has been working with the applicant on a number of items <br />regarding the construction of Oneka Parkway. <br /> <br />The City has a 100 feet roadway easement to the west of the development on another property, <br />for the extension of Oneka Parkway to 165th Street. The City acquired the easement with the <br />subdivision of the property to the west in 2004 in anticipation of the extension of Oneka <br />Parkway. The applicant is showing the extension of Oneka Parkway to extend to the north <br />property line of the development. <br /> <br />Outlot G shall be dedicated as right-of-way. <br /> <br />Sidewalks and Trails <br /> <br />The developer is proposing to continue the trail and sidewalks on Oneka Park. They are also <br />proposing to extend the trail on the west side of Fair Oaks Avenue North and extend it to the east <br />to connect to future trails. Sidewalks are proposed along all remaining streets. This is in keeping <br />with the neighborhood to the south and allow for connections to future development. <br /> <br />Drainage/Grading <br /> <br />The stormwater on the site will be managed with onsite stormwater ponds. The ponds are <br />properly sized to provide the required water volume. Staff will continue to work with the <br />applicant on the technical details of the plans and modeling. Staff has provided the applicant with <br />red-lined comments that will need to be addressed prior to issuing a stormwater permit for the for <br />development. <br /> <br />Water Re-use <br /> <br />The plans include the installation of a stormwater reuse system to be utilized to irrigate <br />individual lots. The system is feasible from a water availability and equipment standpoint and <br />staff will finalize the technical details as the project moves forward. The system will be installed <br />by the applicant and owned/operated/maintained by the homeowner’s association. The system <br />will be part of the overall stormwater management improvements to be included as part of the <br />stormwater permit. A stormwater reuse agreement between the City and the applicant shall be <br />recorded. The agreement will include provisions that will allow the City to operate the system in <br />the event that it is necessary to maintain compliance with the stormwater permit. The provisions <br />will include an ability to assess any City costs associated with operation and maintenance of the <br />system. <br /> <br /> <br />