Laserfiche WebLink
<br />S:\Users\R_Juba\DEVELOPMENT PROJECTS\Oneka Prairie\Final Plat\Engineers Memo and Redlined Comments\Engineers Memo Oneka Prairie Final Plat - <br />060823.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM June 8, 2023 <br /> <br /> <br /> <br />Ms. Rachel Juba <br />Community Development Director <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br /> <br />Re: Oneka Prairie <br />Preliminary Plat Review <br /> WSB Project No. 020725-000 <br /> <br />Dear Ms. Juba: <br /> <br />We have reviewed the Final Plat Submittal for the Oneka Prairie development. We have <br />reviewed the following information related to this application: <br /> <br />• Oneka Prairie Construction Documents dated May 31, 2023, for Southwind Holdings, <br />LLC by Anderson Engineering <br />• Oneka Prairie Final Plat received June 5th, 2023 <br />• Stormwater Management Plan revised May 17, 2023, for Southwind Holdings, LLC by <br />Anderson Engineering <br /> <br />Based on the review of the documents, we offer the following comments related to this <br />application: <br /> <br /> <br />General/Access <br /> <br />1. The subject property is located north of Empress Avenue North (constructed as part of the <br />Oneka Place Development), south of 165th Street and east of the extension of Oneka <br />Parkway. <br /> <br />2. The development plans include the extension of Oneka Parkway along the full length of the <br />development. Two access points along Oneka parkway are proposed with a 3rd access point <br />into the development coming from the extension of Fairoaks Avenue that was constructed as <br />part of the Oneka Place Development. <br /> <br />3. An existing 100-ft easement exists for the construction of Oneka Parkway. Outlot G is now <br />included as dedicated as right-of-way. <br /> <br />4. Connection of Oneka Parkway to 165th Street is not planned for this development. <br /> <br />5. Minor detailed redline comments have been provided on the plans and sent to the applicants <br />engineer so they can be addressed in future submittals. <br /> <br />Utility Plan <br /> <br />6. As identified in the City’s Comprehensive Water Supply and Distribution Plan, a 12” trunk <br />watermain will need to be extended north from the existing 12” trunk watermain located within <br />Oneka Parkway with the City of Hugo paying for oversizing costs.