Laserfiche WebLink
Ms. Rachel Juba <br />July 6, 2023 <br />Page 2 <br />Stormwater <br /> <br />5. Stormwater permitting for the overall Adelaide Development excluded the 7th and 8th Addition <br />area. A separate stormwater permit from the City will be required to be obtained for the 7th <br />and 8th Additions. <br /> <br />6. Rate control for the site is proposed to be met utilizing a stormwater pond onsite. Water <br />quality requirements are met through the water reuse system constructed with the overall <br />Adelaide Development which will be used to irrigate the 7th and 8th Additions. <br /> <br />7. Confirmation of the existing home elevations adjacent to the 8th Addition are needed to <br />confirm freeboard requirements for the site are met. <br /> <br /> <br />Thank you for the opportunity to provide comments on this project. Additional detailed red-lined <br />comments have been provided to the applicant’s engineer. These comments will need to be <br />addressed prior to approval of the construction plans. If you have any questions, please do not <br />hesitate to contact me at 651-286-8463. <br /> <br />Sincerely, <br /> <br />WSB <br /> <br /> <br />Mark Erichson, PE <br />City Engineer <br /> <br />cc: Scott Anderson, Public Works Director (email only) <br /> Liz Finnegan, Senior Engineering Technician (email only) <br /> Ben Schmidt, Twin Cities Land Development (email only) <br /> Brian Krystofiak, Carlson McCain (email only) <br /> <br /> <br /> <br />