My WebLink
|
Help
|
About
|
Sign Out
Home
2023.10.16 Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2023 CC Packets
>
2023.10.16 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2023 4:49:55 PM
Creation date
10/16/2023 4:47:28 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
10/16/2023
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Feasibility Report <br />2024 125th Street and Dellwood Ridge Neighborhood Street Improvement Project <br />City of Hugo <br />WSB Project No. 023540-000 Page 1 <br />1. Executive Summary <br />The proposed improvements for the 2024 125th Street and Dellwood Ridge Neighborhood Street <br />Improvement Project consist of roadway reclamation and overlay, complete roadway reconstruction, and <br />storm sewer improvements in Hugo, MN. <br /> <br />Roadway reclamation and overlay improvements are proposed along 125th Street North from Goodview <br />Avenue North to 122nd Street North and complete roadway reconstruction and storm improvements <br />proposed along Upper Heather Avenue North and Heather Avenue North. <br /> <br />A map of the proposed street improvements is located on Figure 1 in Appendix A. Most of the project is <br />zoned Rural Residential (RR) including both Heather Avenue, Upper Heather Avenue, properties north of <br />125th Ave, and properties west of Upper Heather Ave. The remaining portion of the project area including <br />the portion south and east of Heather Ave is zoned as Planned Unit Development (PUD). <br /> <br />The total estimated project costs for the 2024 125th Street and Dellwood Ridge Neighborhood Street <br />Improvement Project is $3,931,500. The project costs include a 10% contingency and 30% indirect costs. <br />Funding for the project will consist of City Street Capital Improvement Plan (CIP) Funds and Special <br />Assessments to benefitting properties. A detailed Opinion of Probable Cost can be found in Appendix B <br />for improvements along 125th Street North, and in Appendix C for improvements along Upper Heather <br />Avenue North and Lower Heather Avenue North. <br /> <br />The project schedule proposed includes construction beginning spring 2024, with substantial completion <br />by fall 2024. <br /> <br />The project is feasible, necessary, and cost effective from an engineering standpoint and should be <br />constructed as proposed herein. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.