My WebLink
|
Help
|
About
|
Sign Out
Home
2023.10.16 Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2023 CC Packets
>
2023.10.16 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2023 4:49:55 PM
Creation date
10/16/2023 4:47:28 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
10/16/2023
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feasibility Report <br />2024 125th Street and Dellwood Ridge Neighborhood Street Improvement Project <br />City of Hugo <br />WSB Project No. 023540-000 Page 3 <br />3. Existing Conditions <br />3.1 Surface <br />The project area is surrounded primarily by residential properties that contain landscaping, trees, and <br />numerous other private improvements beyond the edge of the roadway and within the City right-of-way. <br />125th Street exists as 24-foot, asphalt paved, rural residential roadway (meaning no curb and gutter) and <br />Upper Heather Avenue and Heather Avenue exist as 32-foot-wide, asphalt paved with bituminous curb in <br />poor condition. <br />Both roadways are experiencing various severities of distresses including alligator, block, transverse, and <br />longitudinal cracking, along with localized drainage issues. <br />3.2 Storm Sewer <br />Stormwater is collected in existing drainage ditches along both sides of the roadway of 125th Street and <br />conveyed to ponds adjacent to the roadway. Stormwater is directed to stormwater basins on 125th Street, <br />where it will continue to flow along the road and into the spillways or catch basins along Upper Heather <br />and Heather Avenue. Due to deteriorating bituminous curb on Upper Heather Avenue and Heather <br />Avenue, stormwater runs along and within the roadway. Upper Heather features four catch basins which <br />lead to flared end sections that discharge water into stormwater basins. Heather Avenue has no catch <br />basins and all water at intersections is guided into the ditches using concrete spillways. <br />3.3 Municipal Utilities <br />3.3.1 Sanitary Sewer <br />Properties are currently served by individual, onsite septic systems. <br />3.3.2 Watermain <br />Properties are currently served by individual, on site wells.
The URL can be used to link to this page
Your browser does not support the video tag.