My WebLink
|
Help
|
About
|
Sign Out
Home
2024.03.04 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2024 CC Packet
>
2024.03.04 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2024 8:43:51 AM
Creation date
3/14/2024 3:26:14 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
3/4/2024
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Rachel Juba <br />August 31, 2023 <br />Page 2 <br />S:\Users\R_Juba\DEVELOPMENT PROJECTS\The Shores of Oneka Lake\The Shores of Oneka <br />Lake 3rd Addition Final Plat\Engineers Memo and Comments\LTR-r juba-Shores of Oneka Lake <br />3rd Final Plat - 20240228.docx <br />8. The site meets rate control requirements through the stormwater ponds onsite. <br />9. Detailed redline drainage comments on the 3rd Addition have been provided to the applicant <br />and will need to be addressed prior to the issuance of the stormwater permit. <br /> <br />Wetlands <br /> <br />10. Site grading for the remaining portion of the development is underway and is consistent with <br />the overall grading plan and preliminary plat approvals. All wetland impacts are proposed as <br />part of the 2nd addition. <br /> <br /> <br />Thank you for the opportunity to provide comments on this project. Additional detailed, red-lined <br />comments have been provided to the applicant’s engineer and we have had meetings to discuss <br />how they propose to modify the plans. These minor comments will need to be addressed prior to <br />approval of the construction plans. If you have any questions, please do not hesitate to contact <br />me at 651-286-8463. <br /> <br />Sincerely, <br /> <br /> <br />Mark Erichson, PE <br />City Engineer <br /> <br />cc: Scott Anderson, Public Works Director (email only) <br /> Liz Finnegan, Senior Engineering Technician (email only) <br /> Brian Krystofiak, Carlson McCain (email only)
The URL can be used to link to this page
Your browser does not support the video tag.