Laserfiche WebLink
Resolution 2022- <br /> Page 2 <br /> 1. An 8' bituminous trail, boardwalk, and landscaping shall be <br /> installed within all of Outlot G that is in phase 2. Final <br /> location of the trail and boardwalk shall be reviewed and <br /> approved by staff prior to installation. This shall be <br /> constructed by and paid for by the developer. <br /> 2. The trail locations and trail connections to the parks to the <br /> south and the connections to the development shall be <br /> reviewed and approved by staff. <br /> 3. Connections to the parks and development shall be <br /> installed. <br /> c. Phase 3 shall include: <br /> i. Park improvements: <br /> 1. The remaining 8' bituminous trail, boardwalk, and <br /> landscaping shall be installed within all of Outlot G. Final <br /> location of the trail and boardwalk shall be reviewed and <br /> approved by staff prior to installation. This shall be <br /> constructed by and paid for by the developer. <br /> 4. Any development of Outlot C or A shall require PUD amendment and PUD General <br /> Plan submittal for review and approval by the City Council. <br /> 5. The building setbacks for the PUD are as follows: <br /> Standards Proposed Proposed Proposed <br /> Single Villa Lots Twinhome <br /> Family Lots Lots <br /> Minimum Lot Smallest Lot Proposed: 5,417 square feet <br /> Size Largest Lot Proposed: 19,201 square feet <br /> Average Lot Proposed: 11,503 square feet <br /> Minimum Lot 65 feet 52 feet 86.7 feet <br /> Width <br /> Front Yard 25 feet 25 feet 25 feet <br /> Setback <br /> Side Yard 7.5 feet 6 feet 7.5 feet <br /> Setback <br /> Rear Yard 30 feet 30 feet 30 feet <br /> Setback <br /> Maximum 45% 45% 45% (both lots <br /> Building combined) <br /> Coverage <br /> Maximum Lot 60% 60% 60% (both lots <br /> Coverage combined <br />