My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 071422
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2022 PC Packets
>
PC PACKET 071422
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2025 1:56:33 PM
Creation date
3/21/2024 10:39:41 AM
Metadata
Fields
Template:
Commissions
Meeting Date
7/14/2022
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTES: <br /> / 4 <br /> V 935.00 932.8o 932.80 1 . OBTAIN CITY OF HUGO EROSION CONTROL, GRADING, AND STORMWATER PERMIT. CONTACT CITY <br /> I I OF HUGO 24 HOURS PRIOR TO INSTALLATION OF ANY STORMWATER BMP. <br /> 2. THE GRADING CONTRACTOR IS RESPONSIBLE FOR THE STRIPPING AND STOCKPILING OF TOPSOIL. <br /> I I I I I TOPSOIL SHALL BE STOCKPILED IN AREAS DESIGNATED BY THE ENGINEER. <br /> 3. COVER OR SEED ALL STOCKPILE AREAS. <br /> 4 GRADING.DISTURBED <br /> AREAS TO BE SW PP AND THE PHASINGUANDED AND FERTILIZED CONSTRUCTION GRADING INPLAN DAYS <br /> FORO ROUGH DETAILS. <br /> / I 5. NO CONSTRUCTION ACTIVITY TO BEGIN PRIOR TO SILT FENCE PLACEMENT. <br /> 934.2 I 93 .7 6. AREAS USING SEDIMENT LOGS WILL BE PLACED AS THE SECOND LAYER OF PERIMETER CONTROL <br /> LIFE = 4.7 - - _ - - - - - - BEHIND THE SILT FENCE, CLOSEST TO THE PROTECTION AREA <br /> 7. SILT FENCE CANNOT BE REMOVED UNTIL RCWD HAS DETERMINED ALL DISTURBED AREAS ARE <br /> FULLY STABILIZED. EROSION CONTROL BLANKET CANNOT BE REMOVED. <br /> 942.0 I \ 8. ALL GRADING OPERATIONS SHALL BE CONDUCTED IN A MANNER TO MINIMIZE THE POTENTIAL FOR <br /> FE = 32 00 I SITE EROSION. <br /> 2.1 9. SEDIMENT TRACKED ONTO THE STREET FROM CONSTRUCTION ACTIVITIES WILL BE REMOVED ON A <br /> GFE = I DAILY BASIS. <br /> 942.6 10. WHEREVER CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED PUBLIC ROADS, <br /> / 4.3� 93 . I PROVISIONS MUST BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT(MUD) BY RUNOFF OR <br /> 942.09 � T VEHICLE TRACKING ONTO THE PAVED ROAD SURFACE, THE ROADS SHALL BE CLEANED <br /> 5 THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM ROADS BY <br /> SHOVELING OR SWEEPING AND BE TRANSPORTED TO A SEDIMENT CONTROLLED DISPOSAL AREA. <br /> STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. <br /> 11. THE GRADING CONTRACTOR SHALL PROVIDE ALL EROSION CONTROL MEASURES CALLED FOR ON <br /> LF = 934 5 I THE PLANS, WHICH MAY INCLUDE SILT FENCE AND ROCK EXITS, WHICH SHALL BE CONSTRUCTED <br /> 934. 0 AND MADE SERVICEABLE PRIOR TO COMMENCING ANY GRADING OPERATIONS. <br /> I LIFE = 34.9 12. ALL EROSION FACILITIES SHALL BE MAINTAINED BY THE CONTRACTOR DURING GRADING <br /> I I OPERATIONS AND UNTIL AFTER TURF IS ESTABLISHED. <br /> 13. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DISPOSE OF LEGALLY AND OFF-SITE, ALL <br /> f I 942.39 71 I I TREES, STUMPS, BRUSH OR OTHER DEBRIS FROM REMOVALS OR ANY DEBRIS THAT EXISTS WITHIN <br /> 1 4GFE _ F I THE CONSTRUCTION AREAS. <br /> WO 942.4 GFE - W 14. ALL GRADED SLOPES SHALL NOT EXCEED 4:1 EXCEPT FOR SEDIMENTATION PONDS. <br /> I 942.8 15. THE CONTRACTOR SHALL VERIFY LOCATION AND ELEVATIONS OF ALL UNDERGROUND UTILITIES AND <br /> 00 wo L 9 CONNECTION POINTS AND ELEVATIONS PRIOR TO CONSTRUCTION, WITH RESPECTIVE UTILITY <br /> 934. 0 I COMPANIES, CITY, STATE AND COUNTIES. <br /> % 16. PIPE OUTLETS MUST BE PROVIDED WITH ENERGY DISSIPATION WITHIN 24 HOURS OF CONNECTION <br /> TO SURFACE WATER. <br /> 17. ALL RIPRAP SHALL BE INSTALLED WITH A FILTER MATERIAL OR SOIL SEPARATION FABRIC AND <br /> COMPLY WITH THE 2020 MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS. <br /> 18. TREE PROTECTION CONSISTING OF SNOW FENCE OR SAFETY FENCE INSTALLED AT THE DRIP LINE <br /> FE - 935.0 SITE. <br /> LL BE IN PLACE PRIOR TO THE BEGINNING OF ANY GRADING OR DEMOLITION WORK AT THE <br /> 19. GRADES SHOWN IN PAVED AREAS REPRESENT FINISH ELEVATION. <br /> 936.10 20. ALL CONSTRUCTION SHALL BE PREFORMED IN ACCORDANCE WITH STATE AND LOCAL STANDARD <br /> LF = 936.1 I SPECIFICATIONS FOR CONSTRUCTION. <br /> / I GFE - 942.89 Z \ 0 � O `9�� I `�W177 21 CREEK SPECIFICATIONS WATERSHEDADISTRICT UNLESSPLY ARE CITY OF OTHERWISE UNOT,ED.ASHINGTON COUNTY, MNDOT AND RICE <br /> 3 942. ` \ 22. THE CONTRACTOR SHALL PROVIDE ALL DUST CONTROL. THE COST SHALL BE INCIDENTAL TO THE <br /> / I I WO 1 7 PROJECT. <br /> GFE = 23. HYDROLOGIC SOIL GROUP TYPE A AND B WILL BE RETAINED, STOCKPILED, STABILIZED AND USED <br /> 944.0 IN POST CONSTRUCTION INFILTRATION BASINS. IF C OR D SOILS ARE FOUND IN THE <br /> WO INFILTRATION BASIN, THEY WILL BE REMOVED AND REPLACED WITH A OR B SOILS. <br /> 942.89 \ N0 0.8% 936.10 <br /> / - - - k 24. PROPOSED CURB AND GUTTER AND BITUMINOUS ROADWAY SHALL MATCH THE EXISTING CURB, <br /> GUTTER AND BITUMINOUS. <br /> 25. NOTIFY CITY OF HUGO ENGINEERING DEPT. AT LEAST 24 HOURS PRIOR TO THE CONSTRUCTION <br /> CB 11 OF STORMWATER BMPs. <br /> 26. DEWATERING IS NOT ANTICIPATED DUE TO GROUNDWATER ELEVATION, IF DEWATERING DOES <br /> >> RI 29 OCCUR IT MUST BE APPROVED BY THE WATERSHED AND CITY OF HUGO. <br /> RIM 939.36 > 27. DEWATERING AND DRAINING NOTES: <br /> >> `\ CONTRACTOR SHALL USE SKIMMERS AND FILTERS PER MANUFACTURERS RECOMMENDED <br /> 9 .9 35. <br /> F 1 PROCEDUREDEWATERING.79 SHALL TAKE PLACE AFTER SEDIMENT HAS SETTLED. <br /> \ I = �� ' \ <br /> 1 ° / CONTRACTOR SHALL PREVENT EROSION AND SCOUR AT DISCHARGE POINTS THROUGH THE <br /> GF = \ USE OF AN ENERGY DISSIPATION DEVICE. <br /> 943. / DEWATERING MUST AVOID NUISANCE CONDITIONS. <br /> Iwo 943.79 <br /> 35.9 <br /> II 1 <br /> / 100, <br /> 100, <br /> A <br /> I44.19 GFE = <br /> 944.2 ``� _ /� <br /> / I / LIFE = 936.3 <br /> f <br /> \ wo <br /> ti <br /> V/ // / <br /> - 931 <br /> // <br /> W <br /> h .3 - 929 ( � / <br /> \ w / 0 15 30 60 <br /> I \ / / FEET <br /> Cti <br /> UTILITIES: CENTURYLINK (763) 712-5017 DATE REVISION HISTORY I HEREBY CERTIFY THAT PLAN WAS 13635 Johnson Street DWG: 2112 GRADING 1 <br /> PRECENTERPOINT ENERGY (763) 323-2760 05/13/22 LANDSCAPE PLAN DIRECTPSUPDERBI M EMY <br /> T AM A Ham Lake, MN 55304 GOODVIEW ESTATES DATE: 07/06/22 <br /> COMCAST (952) 607 4078 DULY ER OfESSIONALRFC ENGINEERING , IN ■ HUGO, MN <br /> GOPHER STATE CONNEXUS ENERGY (763) 323-4268 06/09/22 CITY COMMENTS � Telephone 763-862-8000 JOB NUMBER: 2112 <br /> ENGINEEr T! LAWS OF THE P <br /> ONE CALL XCEL ENERGY (612) 526-4508 06/29/22 OUTLOT CONFIGURATION MINNESOTA. Fax 763-862-8042 <br /> HUGO PUBLIC WORKS (651) 762-6301 07/06/22 CITY COMMENTS Q C o n s u � t i n En ineer s GRADING AND DRAINAGE PLAN SHEET:C22 OF 67 <br /> 800-252-1166 651-454-0002 I I DATE REG. N0. � � <br /> DESIGN BY: DAK DRAWN BY: LDZ/KDD CHECKED BY: TPC FILE: 37-1 - 122 <br />
The URL can be used to link to this page
Your browser does not support the video tag.