Laserfiche WebLink
y,5b � � I I � I NOTES: <br /> 1 . OBTAIN CITY OF HUGO EROSION CONTROL, GRADING, AND STORMWATER PERMIT. CONTACT CITY <br /> I I I I I \ OF HUGO 24 HOURS PRIOR TO INSTALLATION OF ANY STORMWATER BMP. <br /> I , 2. THE GRADING CONTRACTOR IS RESPONSIBLE FOR THE STRIPPING AND STOCKPILING OF TOPSOIL. <br /> TOPSOIL SHALL BE STOCKPILED IN AREAS DESIGNATED BY THE ENGINEER. <br /> \ I \ I 3. COVER OR SEED ALL STOCKPILE AREAS. <br /> 4. ALL DISTURBED AREAS TO BE SEEDED, MULCHED AND FERTILIZED WITHIN 7 DAYS OF ROUGH <br /> I GRADING. *SEE SWPPP AND THE PHASING AND CONSTRUCTION GRADING PLAN FOR DETAILS. <br /> - 934 - - - 5. NO CONSTRUCTION ACTIVITY TO BEGIN PRIOR TO SILT FENCE PLACEMENT. <br /> I I I I 6. AREAS USING SEDIMENT LOGS WILL BE PLACED AS THE SECOND LAYER OF PERIMETER CONTROL 933 - - I - - _ _ BEHIND THE SILT FENCE, CLOSEST TO THE PROTECTION AREA <br /> 932 - - - 7. SILT FENCE CANNOT BE REMOVED UNTIL RCWD HAS DETERMINED ALL DISTURBED AREAS ARE <br /> i FULLY STABILIZED. EROSION CONTROL BLANKET CANNOT BE REMOVED. <br /> \ r 8. ALL GRADING OPERATIONS SHALL BE CONDUCTED IN A MANNER TO MINIMIZE THE POTENTIAL FOR <br /> SITE EROSION. <br /> 9. SEDIMENT TRACKED ONTO THE STREET FROM CONSTRUCTION ACTIVITIES WILL BE REMOVED ON A <br /> \ \ I DAILY BASIS. <br /> \ \\ I I I I I I \ I I 10. WHEREVER CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED PUBLIC ROADS, <br /> PROVISIONS MUST BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT(MUD) BY RUNOFF OR <br /> I J VEHICLE TRACKING ONTO THE PAVED ROAD SURFACE, THE ROADS SHALL BE CLEANED <br /> \ \ \ THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM ROADS BY <br /> g3_ \ SHOVELING OR SWEEPING AND BE TRANSPORTED TO A SEDIMENT CONTROLLED DISPOSAL AREA. <br /> -� - - - STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. <br /> 11 . THE GRADING CONTRACTOR SHALL PROVIDE ALL EROSION CONTROL MEASURES CALLED FOR ON <br /> _ - THE PLANS, WHICH MAY INCLUDE SILT FENCE AND ROCK EXITS, WHICH SHALL BE CONSTRUCTED <br /> _937 - _ _ AND MADE SERVICEABLE PRIOR TO COMMENCING ANY GRADING OPERATIONS. <br /> 12. ALL EROSION FACILITIES SHALL BE MAINTAINED BY THE CONTRACTOR DURING GRADING <br /> OPERATIONS AND UNTIL AFTER TURF IS ESTABLISHED. <br /> 13. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DISPOSE OF LEGALLY AND OFF- <br /> SITE, ALL <br /> / I NWL: 926.0 I I I - - - -L �� TREES, STUMPS, BRUSH OR OTHER DEBRIS FROM REMOVALS OR ANY DEBRIS THAT EXISTS WITHIN <br /> HWL: 930.0 THE CONSTRUCTION AREAS. <br /> 14. ALL GRADED SLOPES SHALL NOT EXCEED 4:1 EXCEPT FOR SEDIMENTATION PONDS. <br /> 15. THE CONTRACTOR SHALL VERIFY LOCATION AND ELEVATIONS OF ALL UNDERGROUND UTILITIES AND <br /> / I LFE - 934.0 LFE - 934.0 = LFE - 934.0 CONNECTION POINTS AND ELEVATIONS PRIOR TO CONSTRUCTION, WITH RESPECTIVE UTILITY <br /> / I I FES 31 RIM 930.00 LFEI I I COMPANIES, CITY, STATE AND COUNTIES. <br /> 16. PIPE OUTLETS MUST BE PROVIDED WITH ENERGY DISSIPATION WITHIN 24 HOURS OF CONNECTION <br /> NY// 3L�E 7 _ I TO SURFACE WATER. <br /> - 933.7 I I I 17. ALL RIPRAP SHALL BE INSTALLED WITH A FILTER MATERIAL OR SOIL SEPARATION FABRIC AND <br /> I COMPLY WITH THE 2020 MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS. <br /> II WO _ W WO GFE - WO 18. TREE PROTECTION CONSISTING OF SNOW FENCE OR SAFETY FENCE INSTALLED AT THE DRIP LINE <br /> I I GFE _ - GFE = E = SHALL BE IN PLACE PRIOR TO THE BEGINNING OF ANY GRADING OR DEMOLITION WORK AT THE <br /> WO 941.9 941.9 941.9 941.9 1.9 SITE. <br /> 19. GRADES SHOWN IN PAVED AREAS REPRESENT FINISH ELEVATION. <br /> / 20. ALL CONSTRUCTION SHALL BE PREFORMED IN ACCORDANCE WITH STATE AND LOCAL STANDARD <br /> 941E6 941 9 \ I 94189 I 194�1.89 I 941.8 I 941.897 SPECIFICATIONS FOR CONSTRUCTION. <br /> 21 . SPECIFICATIONS THAT APPLY ARE THE CITY OF HUGO, WASHINGTON COUNTY, MNDOT AND RICE <br /> I I I I I I CREEK WATERSHED DISTRICT UNLESS OTHERWISE NOTED. <br /> I I 159 J v � v v o� _ 22. THE CONTRACTOR SHALL PROVIDE ALL DUST CONTROL. THE COST SHALL BE INCIDENTAL TO THE <br /> I PROJECT. <br /> I I \ 3.70 ONR <br /> _ 23. HYDROLOGIC SOIL GROUP TYPE A AND B WILL BE RETAINED, STOCKPILED, STABILIZED AND USED <br /> I / I I \ \ iuuuuuuuuuui IN POST CONSTRUCTION INFILTRATION BASINS. IF C OR D SOILS ARE FOUND IN THE <br /> INFILTRATION BASIN, THEY WILL BE REMOVED AND REPLACED WITH A OR B SOILS. <br /> "KIM 938. 4- 24. PROPOSED CURB AND GUTTER AND BITUMINOUS ROADWAY SHALL MATCH THE EXISTING CURB, <br /> LFE - 933.7 ' GUTTER AND BITUMINOUS. <br /> 7 J - RIM 939.30 13 4T H _STREET �`oI� _ 25. NOTIFY CITY OF HUGO ENGINEERING DEPT. AT LEAST 24 HOURS PRIOR TO THE CONSTRUCTION <br /> OF STORMWATER BMPs. <br /> \ o 0 0 26. DEWATERING IS NOT ANTICIPATED DUE TO GROUNDWATER ELEVATION, IF DEWATERING DOES <br /> 3.70W \ 1- 0 0 0 o OCCUR IT MUST BE APPROVED BY THE WATERSHED AND CITY OF HUGO. <br /> I 27. DEWATERING AND DRAINING NOTES: <br /> QQ \ 941E6 59�� M 938 96 CBMH 25 • CONTRACTOR SHALL USE SKIMMERS AND FILTERS PER MANUFACTURERS RECOMMENDED <br /> / PROCEDURES. <br /> /� CBM / �� DEWATERING SHALL TAKE PLACE AFTER SEDIMENT HAS SETTLED. <br /> ° CONTRACTOR SHALL PREVENT EROSION AND SCOUR AT DISCHARGE POINTS THROUGH THE <br /> RIM 939.01 - USE OF AN ENERGY DISSIPATION DEVICE. <br /> 1 II 98y / F- A �� DEWATERING MUST AVOID NUISANCE CONDITIONS. <br /> I II IL <br /> H 2� <br /> 94,Y89 9 .8 I _ 94�.69 _ 94( <br /> / - 1 GFE - <br /> I 9 2.09 A,� �;Q. 942.9 940.7 940.7 I I I GF = <br /> r � 43�8kE _ <br /> I I F = 934.2 94 .1 33 00 a / 943.9 <br /> II LFE = 935.0 LFE = 932.8 LFE = 932.8 <br /> 0 4.70 r l I 1 <br /> / 942. z I <br /> L \ 6 ,> I LFE = 36.0 / <br /> V j W 0 I�- O 935.00 0 932.80 W O 932.80 <br /> LJ- I I AK <br /> J <br /> LFE = 934.2 IR I 93 .7 <br /> LFE = 4.7 � - - - - - - - - <br /> 1 <br /> 5�rri GFE = 00 l i v 2.1 <br /> WO 1 r <br /> GFE _ \ <br /> � /N 942.6 W <br /> \ C <br /> 4.3% L 93 .7o <br /> L <br /> 942.09 I <br /> LF = 934.5 M A <br /> LFE 4 34.9 <br /> < » - 934. 0 <br /> 1 = / <br /> I I v � I IR I 0 15 30 60 <br /> 1 <br /> GFE _ 942.39 I I1Z FEET <br /> 942.4 c7f-M-71-7- 6 <br /> I GFE <br /> / 942.8 <br /> 4.4% 31 00 934.00 � <br /> UTILITIES: CENTURYLINK (763) 712-5017 DATE REVISION HISTORY I HEREBY CERTIFY THAT PLAN WAS 13635 Johnson Street DWG: 2112 GRADING 2 <br /> CENTERPOINT ENERGY (763) 323-2760 05/13/22 LANDSCAPE PLAN PREPARED BY M Ei�( MY GOODVIEW ESTATES DATE: 07 06 22 <br /> COMCAST (952) 607 4078 DIRECT SUPER I ND ONAM A RFC ENGINEERING , IN Ham Lake, MN 55304SOPHER STATE CONNEXUS ENERGY (763) 323-4268 06/09/22 CITY COMMENTS Telephone 763-862-8000 HUGO MN JOB NUMBER: 2112 <br /> ENGINE E LAWS OF THE P <br /> ONE CALL XCEL ENERGY (612) 526-4508 06/29/22 OUTLOT CONFIGURATION MINNESOTA. Fax 763-862-8042 GRADING AND DRAINAGE PLAN <br /> HUGO PUBLIC WORKS (651) 762-6301 07/06/22 CITY COMMENTS � Consulting Engineer � SHEET:C23 OF 67 <br /> 800-252-1166 651-454-0002 I I DATE REG. N0. FILE: 3 7-1 - 12 3 <br /> DESIGN BY: DAK DRAWN BY: LDZ/KDD CHECKED BY: TPC <br />